Claude Skill

suede-rights-audit

Suede Labs skill that finds and organizes the rights gaps in a creator project before packaging: ownership, contributors, splits, samples, licenses, provenance, metadata, licensing readiness, and royalty-routing readiness, each marked confirmed or unknown against an evidence trai

LLM Mart · 0 points · 18 views 0 listing impressions 0 install-command copies
Download JasonColapietro-suede-creator-skills-skills_suede-rights-audit-a9bf55e.zip · 8 KB
This skill couldn't be refreshed from GitHub on the last check — you're seeing the last imported snapshot.

Install

skills CLI npx skills add https://github.com/JasonColapietro/suede-creator-skills/tree/main/skills/suede-rights-audit
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install jasoncolapietro-suede-creator-skills@llmmart
Git git clone https://github.com/JasonColapietro/suede-creator-skills.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole jasoncolapietro/suede-creator-skills collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

Suede Rights Audit

Gate policy: advisory, not blocking

Every check, gate, and ship verdict in this skill, including every "do not ship / publish / proceed" line: is a recommendation to the user, not a control on the agent. Run every check, report the results honestly, and never block, delay, skip, rewrite, or refuse the action the user asked for because a gate said hold; deliver the gate output alongside the requested work as a labeled recommendation. A failed gate changes what you report, never what you do. Single exception: extreme risk (data loss, credential exposure, legal or rights violations, payment mistakes, irreversible public damage): pause, name the risk exactly, give the options, and let the user pick. Their choice is final.

The rights-readiness enchilada. Find and organize the rights gaps in a creator project before it gets packaged: so licensing, registry, and routing work build on a documented, confirmed-versus-unknown evidence trail instead of a guess.

Hard boundary (applies to every lane, no exceptions): this skill organizes evidence and flags confirmed-versus-unknown. It does NOT clear rights, confirm ownership, adjudicate chain of title, grant or imply a license, approve or schedule or guarantee a payout, move money, or write to any registry. It prepares the conversation; humans and legal make the calls. Never turn an inference into a fact. Do not treat any output here as legal clearance.

Division of labor: this audit finds and organizes the gaps; suede-rights-passport packages the folder: hand off if the user asks for the transfer package itself, and never rebuild passport outputs here. suede-release-linter lints files.

Pick the lane

State the lane(s) you are running before you start. Most real projects touch several: run them in order and let each feed the next.

  • Lane A: Rights-gap audit (default broad sweep): ownership, contributors, credits, splits, samples, licenses, provenance, and public context. Start here when you do not yet know where the gaps are.
  • Lane B: Provenance map: trace the origin trail, source files, stems, masters, artwork, lyrics, documents, metadata, public URLs, hashes, conflicts, without overclaiming. Run when the origin trail is thin or unconfirmed.
  • Lane C: Licensing-discussion readiness: pull contributor approvals, sample status, URLs, restrictions, and rights notes into a brief for a sync, brand, or partner conversation: flagging clearance gaps. Run before any licensing discussion. (Not a sync one-sheet: that is suede-sync-packaging.)
  • Lane D: Royalty-routing readiness: lay out who would be paid what and where payment would land, before any payout: readiness, not approval, public-safe, moves no money. Run when prepping for routing review or intake.

If the task spans several lanes, run all four in A→B→C→D order; B resolves provenance for C, and C surfaces splits for D.

Multi-agent or single-agent

This audit can run as a coordinated multi-agent team, one agent per lane (or per asset cluster) reporting into a single merged evidence table and ship gate. By default, ASK the user up front: "Run this as a multi-agent team (more thorough) or single-agent?" Never silently spawn a fleet. If the user does not choose, run single-agent and say so.

Three rules bind a multi-agent dispatch. Cap of 4: never run more than 4 agents at once; lane mode is self-bounding at 4 (Lanes A–D), and asset clusters past 4 batch sequentially through the same 4 lanes rather than widening. Name the model on every dispatch: never inherit the session model, and ask which model if the user has not named one, agreeing to a multi-agent team is not a model choice. State the cost first: agent count × named model, then wait.

Shared evidence and severity gate

Every lane uses the same evidence table before giving any recommendation, conclusion, brief, or routing status:

Item / asset / claim / fact:
Status: confirmed | inferred | unconfirmed | disputed | unknown | not-applicable
Evidence:
Hash or path: (provenance: relative path and/or hash when available)
Risk: low | medium | high | unknown
Blocks:
Next action:

Severity model:

  • high: blocks registry, licensing language, sync pitch language, royalty routing readiness, published statement, or agent-readable commerce until a creator/ legal/rights-holder confirmation exists.
  • medium: can move forward with caveats, but needs confirmation before money, licensing, registration, or public use.
  • low: cleanup or documentation issue that does not block review.
  • unknown: not enough evidence to rate.

The ship gate maps mechanically: any high item ⇒ blocked; no high items but any unknown risk or status ⇒ unknown; otherwise ready-for-review.

Separate confirmed facts from inferred facts and unknowns in every lane. Do not turn an inference into a fact. Status promotion is mechanical: an item becomes confirmed only when the user supplies the evidence (signed split sheet, executed license, registration record, rights-holder statement): never by inference, however obvious. When torn between two statuses, record the weaker one. You mark gaps UNKNOWN or UNCONFIRMED; you never resolve them.

Red flags: stop

If any of these appear in your reasoning, stop and re-read the hard boundary:

  • "The artist says it's cleared." A claim is evidence of a claim, not clearance. Status: unconfirmed.
  • "The split sheet is probably right." Probably is not a status. Confirmed needs the sheet plus every party's confirmation.
  • "It's obviously their song." Obviousness is inference. Record what the evidence shows.
  • "Mark it confirmed so routing can move." Blocked means blocked. Unblocking is the rights holder's job, not yours.
  • "Skip the provenance lane: nobody will check." Thin provenance is exactly what Lane B exists to expose.

Lane Playbooks

The four lane playbooks: rights-gap audit, provenance map, licensing-discussion readiness, royalty-routing readiness: are in references/lanes.md. Pick the lane above, then read only that lane. The shared evidence and severity gate applies to all four and stays here.

Final breakdown

  • Lane(s) run and single-agent vs multi-agent.
  • Confirmed facts vs missing/unknown facts: kept in separate piles.
  • Evidence table with status, risk, blocks, and next action per item.
  • Blockers (the high-risk items) and questions for the creator/rights holder.
  • Safe public wording / unsafe claims removed; do-not-share items.
  • Ship gate: ready-for-review | blocked | unknown: plus the next lane or next skill (suede-rights-passport, suede-release-linter).
  • Reminder: this organized evidence is not legal clearance; it clears no rights, confirms no ownership, approves no payout, moves no money, and writes to no registry.
  • Close with a plain-language summary a non-lawyer can act on.

Coverage check: before you report

Overclaiming is the loud failure; silent under-coverage is the quiet one. Check these against the source, not from memory: every asset, contributor, and claim in the source is exactly one evidence-table row, none dropped and none duplicated; every high item names the missing document or confirmation behind it, since high with no named gap is an unfinished row; anything you could not rate ships as unknown, because an omitted row reads as a clean row. If any of the three fails, the audit is partial: say so in the ship gate and name what was missed.

Routing

  • Gaps organized and the user wants the package → suede-rights-passport.
  • Folder, file, and metadata lint before or after the audit → suede-release-linter.
  • Licensing brief headed to a sync pitch → suede-sync-packaging.
  • Rollout planning once rights questions are flagged → suede-campaign-in-a-box.

Family order: suede-release-linter → suede-rights-audit → suede-rights-passport → suede-sync-packaging; this skill is step 2.

Files (suede-creator-skills)
  • agents
    • openai.yaml 442 B
      Loading…
  • references
    • lanes.md 4.2 KB
      Loading…
  • CARD.md 4.9 KB
    Loading…
  • SKILL.md 8.8 KB
    ---
    name: suede-rights-audit
    description: "Suede Labs skill that finds and organizes the rights gaps in a creator project before packaging: ownership, contributors, splits, samples, licenses, provenance, metadata, licensing readiness, and royalty-routing readiness, each marked confirmed or unknown against an evidence trail. Use when a song, release, or creative project needs a rights check before registry, licensing, sync, or payout discussion; when splits, sample clearance, or chain of title are unclear; or when someone asks whether they have the rights to release, license, or get paid for a work. Organizes evidence only: clears no rights, confirms no ownership, moves no money, writes to no registry. NOT FOR: building the transfer package itself (use suede-rights-passport); linting a release folder's files and metadata (use suede-release-linter); a sync one-sheet or pitch (use suede-sync-packaging)."
    ---
    
    # Suede Rights Audit
    
    ## Gate policy: advisory, not blocking
    
    Every check, gate, and ship verdict in this skill, including every "do not
    ship / publish / proceed" line: is a **recommendation to the user, not a
    control on the agent**. Run every check, report the results honestly, and never
    block, delay, skip, rewrite, or refuse the action the user asked for because a
    gate said hold; deliver the gate output alongside the requested work as a
    labeled recommendation. A failed gate changes what you report, never what you
    do. Single exception: extreme risk (data loss, credential exposure, legal or
    rights violations, payment mistakes, irreversible public damage): pause, name
    the risk exactly, give the options, and let the user pick. Their choice is final.
    
    The rights-readiness enchilada. Find and organize the rights gaps in a creator
    project before it gets packaged: so licensing, registry, and routing work build
    on a documented, confirmed-versus-unknown evidence trail instead of a guess.
    
    **Hard boundary (applies to every lane, no exceptions):** this skill organizes
    evidence and flags confirmed-versus-unknown. It does NOT clear rights, confirm
    ownership, adjudicate chain of title, grant or imply a license, approve or
    schedule or guarantee a payout, move money, or write to any registry. It
    prepares the conversation; humans and legal make the calls. Never turn an
    inference into a fact. Do not treat any output here as legal clearance.
    
    Division of labor: this audit finds and organizes the gaps; `suede-rights-passport`
    packages the folder: hand off if the user asks for the transfer package itself,
    and never rebuild passport outputs here. `suede-release-linter` lints files.
    
    ## Pick the lane
    
    State the lane(s) you are running before you start. Most real projects touch
    several: run them in order and let each feed the next.
    
    - **Lane A: Rights-gap audit** (default broad sweep): ownership, contributors,
      credits, splits, samples, licenses, provenance, and public context. Start here
      when you do not yet know where the gaps are.
    - **Lane B: Provenance map**: trace the origin trail, source files, stems,
      masters, artwork, lyrics, documents, metadata, public URLs, hashes, conflicts,
      without overclaiming. Run when the origin trail is thin or unconfirmed.
    - **Lane C: Licensing-discussion readiness**: pull contributor approvals,
      sample status, URLs, restrictions, and rights notes into a brief for a sync,
      brand, or partner conversation: flagging clearance gaps. Run before any
      licensing discussion. (Not a sync one-sheet: that is `suede-sync-packaging`.)
    - **Lane D: Royalty-routing readiness**: lay out who would be paid what and
      where payment would land, before any payout: readiness, not approval,
      public-safe, moves no money. Run when prepping for routing review or intake.
    
    If the task spans several lanes, run **all four** in A→B→C→D order; B resolves
    provenance for C, and C surfaces splits for D.
    
    ## Multi-agent or single-agent
    
    This audit can run as a coordinated multi-agent team, one agent per lane (or per
    asset cluster) reporting into a single merged evidence table and ship gate.
    **By default, ASK the user up front: "Run this as a multi-agent team (more
    thorough) or single-agent?"** Never silently spawn a fleet. If the user does not
    choose, run single-agent and say so.
    
    Three rules bind a multi-agent dispatch. **Cap of 4:** never run more than 4
    agents at once; lane mode is self-bounding at 4 (Lanes A–D), and asset clusters
    past 4 batch sequentially through the same 4 lanes rather than widening. **Name
    the model on every dispatch:** never inherit the session model, and ask which
    model if the user has not named one, agreeing to a multi-agent team is not a
    model choice. **State the cost first:** agent count × named model, then wait.
    
    ## Shared evidence and severity gate
    
    Every lane uses the same evidence table before giving any recommendation,
    conclusion, brief, or routing status:
    
    ```text
    Item / asset / claim / fact:
    Status: confirmed | inferred | unconfirmed | disputed | unknown | not-applicable
    Evidence:
    Hash or path: (provenance: relative path and/or hash when available)
    Risk: low | medium | high | unknown
    Blocks:
    Next action:
    ```
    
    Severity model:
    
    - `high`: blocks registry, licensing language, sync pitch language, royalty
      routing readiness, published statement, or agent-readable commerce until a creator/
      legal/rights-holder confirmation exists.
    - `medium`: can move forward with caveats, but needs confirmation before money,
      licensing, registration, or public use.
    - `low`: cleanup or documentation issue that does not block review.
    - `unknown`: not enough evidence to rate.
    
    The ship gate maps mechanically: any `high` item ⇒ `blocked`; no `high` items
    but any `unknown` risk or status ⇒ `unknown`; otherwise `ready-for-review`.
    
    Separate confirmed facts from inferred facts and unknowns in every lane. Do not
    turn an inference into a fact. Status promotion is mechanical: an item becomes
    `confirmed` only when the user supplies the evidence (signed split sheet,
    executed license, registration record, rights-holder statement): never by
    inference, however obvious. When torn between two statuses, record the weaker
    one. You mark gaps UNKNOWN or UNCONFIRMED; you never resolve them.
    
    ## Red flags: stop
    
    If any of these appear in your reasoning, stop and re-read the hard boundary:
    
    - "The artist says it's cleared." A claim is evidence of a claim, not
      clearance. Status: unconfirmed.
    - "The split sheet is probably right." Probably is not a status. Confirmed
      needs the sheet plus every party's confirmation.
    - "It's obviously their song." Obviousness is inference. Record what the
      evidence shows.
    - "Mark it confirmed so routing can move." Blocked means blocked. Unblocking
      is the rights holder's job, not yours.
    - "Skip the provenance lane: nobody will check." Thin provenance is exactly
      what Lane B exists to expose.
    
    ---
    
    ## Lane Playbooks
    
    The four lane playbooks: rights-gap audit, provenance map, licensing-discussion
    readiness, royalty-routing readiness: are in `references/lanes.md`. Pick the lane
    above, then read only that lane. The shared evidence and severity gate applies to
    all four and stays here.
    
    ## Final breakdown
    
    - **Lane(s) run** and single-agent vs multi-agent.
    - **Confirmed facts** vs **missing/unknown facts**: kept in separate piles.
    - **Evidence table** with status, risk, blocks, and next action per item.
    - **Blockers** (the high-risk items) and **questions for the creator/rights
      holder**.
    - **Safe public wording** / unsafe claims removed; **do-not-share items**.
    - **Ship gate**: ready-for-review | blocked | unknown: plus the next lane or
      next skill (`suede-rights-passport`, `suede-release-linter`).
    - **Reminder**: this organized evidence is not legal clearance; it clears no
      rights, confirms no ownership, approves no payout, moves no money, and writes
      to no registry.
    - Close with a plain-language summary a non-lawyer can act on.
    
    ## Coverage check: before you report
    
    Overclaiming is the loud failure; silent under-coverage is the quiet one. Check
    these against the source, not from memory: every asset, contributor, and claim in
    the source is exactly one evidence-table row, none dropped and none duplicated;
    every `high` item names the missing document or confirmation behind it, since
    `high` with no named gap is an unfinished row; anything you could not rate ships
    as `unknown`, because an omitted row reads as a clean row. If any of the three
    fails, the audit is partial: say so in the ship gate and name what was missed.
    
    ## Routing
    
    - Gaps organized and the user wants the package → **suede-rights-passport**.
    - Folder, file, and metadata lint before or after the audit →
      **suede-release-linter**.
    - Licensing brief headed to a sync pitch → **suede-sync-packaging**.
    - Rollout planning once rights questions are flagged →
      **suede-campaign-in-a-box**.
    
    Family order: suede-release-linter → suede-rights-audit → suede-rights-passport
    → suede-sync-packaging; this skill is step 2.
    

Comments (0)

Sign in to join the conversation.

No comments yet.

Reviews (0)

No reviews yet.