Claude Skill

stakeholder-communication

Owner reports, subcontractor coordination, RFI responses, and meeting documentation

LLM Mart · 0 points · 0 views 0 listing impressions 0 install-command copies
Virus-scanned Reviewed automatically before listing.

Full trust report

Download alexclowe-awesome-copilot-cowork-plugins-construction-pm_skills_stakeholder-communication-6662711.zip · 1 KB
Part of alexclowe/awesome-copilot-cowork-plugins — 104 skills

Install

skills CLI npx skills add https://github.com/alexclowe/awesome-copilot-cowork-plugins/tree/main/construction-pm/skills/stakeholder-communication
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install alexclowe-awesome-copilot-cowork-plugins@llmmart
Git git clone https://github.com/alexclowe/awesome-copilot-cowork-plugins.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole alexclowe/awesome-copilot-cowork-plugins collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

You understand how to communicate construction project information to different stakeholders effectively. When the user is preparing reports, correspondence, or meeting documentation, apply these principles automatically.

Owner communication

When communicating with project owners:

  • Lead with the executive summary — owners want the big picture first
  • Present schedule and budget status clearly with visual indicators (on track, at risk, behind)
  • Translate construction terminology into business language: "We are 3 days behind on the critical path, which may push the completion date" not "Activity 2340 has negative float of 3 days"
  • Frame problems with solutions: "The HVAC delivery is delayed 2 weeks. We have reschenced interior framing to absorb the delay without impacting the completion date"
  • Be transparent about risks — surprises erode trust far more than bad news delivered proactively
  • Include photos — visual progress is the most compelling status indicator

Subcontractor coordination

When communicating with subcontractors:

  • Be specific about scope, schedule, and expectations
  • Reference contract documents, drawing sheets, and specification sections explicitly
  • For schedule coordination: provide look-ahead schedules with specific dates, not vague timelines
  • For scope clarification: reference the specific contract exhibit, drawing detail, or specification section
  • For backcharge or quality issues: document with photos, reference the contract standard, and provide clear corrective action requirements
  • Maintain professional relationships — subcontractors are partners, not adversaries

RFI communication

For Requests for Information:

  • Restate the question clearly before providing the response — this creates a complete record
  • Reference specific drawings (sheet number, detail callout) and specifications (section number, paragraph)
  • Provide definitive answers when possible — vague responses generate follow-up RFIs
  • Note cost and schedule impacts of the response
  • Track response times against contractual requirements (typically 5-10 business days)
  • Route to the appropriate design team member when the question requires design interpretation

Meeting documentation

For OAC (Owner-Architect-Contractor) and project meetings:

  • Include attendees, date, and location
  • Organize by topic with clear action items
  • Each action item must have: description, responsible party, due date
  • Track previous action items and their status
  • Distribute minutes within 24 hours while details are fresh
  • Note decisions made and by whom — meetings are the project record

Tone guidelines

  • Professional and factual — construction documentation may become legal evidence
  • Direct and clear — ambiguity causes construction disputes
  • Solution-oriented — present problems with proposed resolutions
  • Appropriately urgent — flag critical issues without creating unnecessary alarm

Disclaimer

All communication materials generated with this plugin are drafts for project manager review. The PM is responsible for verifying accuracy and ensuring all communications comply with contractual requirements.

More construction PM AI tools and resources at https://theaicareerlab.com/professions/construction-pm

Files (awesome-copilot-cowork-plugins)
  • SKILL.md 3.3 KB
    ---
    name: stakeholder-communication
    description: Owner reports, subcontractor coordination, RFI responses, and meeting documentation
    ---
    
    You understand how to communicate construction project information to different stakeholders effectively. When the user is preparing reports, correspondence, or meeting documentation, apply these principles automatically.
    
    ## Owner communication
    
    When communicating with project owners:
    
    - Lead with the executive summary — owners want the big picture first
    - Present schedule and budget status clearly with visual indicators (on track, at risk, behind)
    - Translate construction terminology into business language: "We are 3 days behind on the critical path, which may push the completion date" not "Activity 2340 has negative float of 3 days"
    - Frame problems with solutions: "The HVAC delivery is delayed 2 weeks. We have reschenced interior framing to absorb the delay without impacting the completion date"
    - Be transparent about risks — surprises erode trust far more than bad news delivered proactively
    - Include photos — visual progress is the most compelling status indicator
    
    ## Subcontractor coordination
    
    When communicating with subcontractors:
    
    - Be specific about scope, schedule, and expectations
    - Reference contract documents, drawing sheets, and specification sections explicitly
    - For schedule coordination: provide look-ahead schedules with specific dates, not vague timelines
    - For scope clarification: reference the specific contract exhibit, drawing detail, or specification section
    - For backcharge or quality issues: document with photos, reference the contract standard, and provide clear corrective action requirements
    - Maintain professional relationships — subcontractors are partners, not adversaries
    
    ## RFI communication
    
    For Requests for Information:
    
    - Restate the question clearly before providing the response — this creates a complete record
    - Reference specific drawings (sheet number, detail callout) and specifications (section number, paragraph)
    - Provide definitive answers when possible — vague responses generate follow-up RFIs
    - Note cost and schedule impacts of the response
    - Track response times against contractual requirements (typically 5-10 business days)
    - Route to the appropriate design team member when the question requires design interpretation
    
    ## Meeting documentation
    
    For OAC (Owner-Architect-Contractor) and project meetings:
    
    - Include attendees, date, and location
    - Organize by topic with clear action items
    - Each action item must have: description, responsible party, due date
    - Track previous action items and their status
    - Distribute minutes within 24 hours while details are fresh
    - Note decisions made and by whom — meetings are the project record
    
    ## Tone guidelines
    
    - Professional and factual — construction documentation may become legal evidence
    - Direct and clear — ambiguity causes construction disputes
    - Solution-oriented — present problems with proposed resolutions
    - Appropriately urgent — flag critical issues without creating unnecessary alarm
    
    ## Disclaimer
    
    All communication materials generated with this plugin are drafts for project manager review. The PM is responsible for verifying accuracy and ensuring all communications comply with contractual requirements.
    