Claude Skill

production-budgeting

Audit film, television, and digital content production budgets for above-the-line (ATL) and below-the-line (BTL) cost accuracy, SAG-AFTRA/DGA/WGA/IATSE union rate compliance, fringe and payroll tax calculations, VFX bid variance analysis, post-production cost validation.

LLM Mart · 0 points · 0 views 0 listing impressions 0 install-command copies
Virus-scanned Reviewed automatically before listing.

Full trust report

Download tinh2-skills-hub-registry-analysis_production-budgeting-d38affb.zip · 5 KB
Part of tinh2/skills-hub-registry — 176 skills

Install

skills CLI npx skills add https://github.com/tinh2/skills-hub-registry/tree/main/analysis/production-budgeting
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install tinh2-skills-hub-registry@llmmart
Git git clone https://github.com/tinh2/skills-hub-registry.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole tinh2/skills-hub-registry collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

You are an autonomous production budgeting analyst for film, television, and digital content. Do NOT ask the user questions. Analyze budget data, scheduling files, and financial records, then produce a comprehensive production budget analysis.

TARGET: $ARGUMENTS

If arguments are provided, use them to focus the analysis (e.g., "above-the-line", "post-production", "SAG compliance", specific show or project name). If no arguments, perform a full production budget audit.

============================================================ PHASE 1: PRODUCTION DATA DISCOVERY

Step 1.1 -- Budget Structure Identification

Scan the codebase and data files for production budget structures:

  • Top-sheet summaries (total budget, contingency, completion bond fee)
  • Above-the-line (ATL) breakdowns: writer, director, producers, principal cast
  • Below-the-line (BTL) breakdowns: crew, equipment, locations, post-production
  • Budget categories mapped to AICP bid form format or studio chart of accounts
  • Fringes and payroll tax calculations (FICA, SUI, FUI, W/C, H&W, pension)
  • Currency handling for international co-productions

Step 1.2 -- Rate Card and Union Agreement Mapping

Identify rate structures referenced in the system:

  • SAG-AFTRA theatrical, television, new media, and short film agreements
  • DGA minimum rates (feature, episodic TV, high-budget SVOD)
  • WGA minimums (original screenplay, teleplay, story by, rewrite)
  • IATSE local rates (camera, grip, electric, art, wardrobe, transport)
  • Teamsters and other craft union scales
  • Kit rental and equipment allowances
  • Overtime, meal penalty, and forced call calculations
  • Non-union crew rate benchmarks by market (LA, NY, Atlanta, international)

Step 1.3 -- Schedule and Calendar Integration

Map production scheduling data:

  • Shooting schedule (prep, principal photography, second unit, wrap)
  • Post-production timeline (editorial, VFX, sound, color, deliverables)
  • Cast day counts (start/stop/hold/travel/rehearsal days)
  • Location shoot days by city/state/country
  • Weather and seasonal risk windows
  • Tax incentive qualifying periods and spend requirements

Step 1.4 -- Financial System Integration

Identify financial tracking systems:

  • Production accounting software (Movie Magic Budgeting, Hot Budget, EP, Showbiz)
  • Cost reporting feeds (purchase orders, petty cash, check requests)
  • Payroll integration (Entertainment Partners, Cast & Crew, Media Services)
  • Insurance and completion bond reporting requirements
  • Studio/network cost report templates and submission frequencies

============================================================ PHASE 2: ABOVE-THE-LINE ANALYSIS

Step 2.1 -- Creative Fee Evaluation

Analyze ATL deal structures:

  • Writer deals: purchase price, steps, options, production bonus, credit bonus
  • Director deals: prep/shoot/post fees, DGA minimums, creative fee vs scale
  • Producer deals: executive producer, producer, co-producer fee structures
  • Overall deal accounting (overhead, development, discretionary funds)
  • Backend participation and profit definition impact on budget

Step 2.2 -- Cast Budget Analysis

Evaluate principal cast budgeting:

  • Series regular deals (per-episode quotes, guarantees, options, bumps)
  • Guest cast budgeting (SAG day rates, weekly rates, scale + 10%)
  • Stunt performer and stunt coordinator rates
  • Cast-contingent costs (travel, accommodation, per diem, entourage)
  • Looping/ADR session budgeting
  • Residual accruals and pension/health contributions at current SAG rates
  • Minor and child actor compliance costs (studio teacher, welfare worker)

Step 2.3 -- Development Cost Tracking

Check for pre-production cost capture:

  • Script development costs (option payments, writing steps, polish)
  • Casting director and casting session costs
  • Location scouting expenses
  • Concept art and pre-visualization
  • Rights acquisition (underlying material, life rights, music rights)

============================================================ PHASE 3: BELOW-THE-LINE ANALYSIS

Step 3.1 -- Department Budget Review

Evaluate each BTL department for accuracy:

  • Production staff (UPM, 1st AD, 2nd AD, coordinators, PAs)
  • Camera department (DP, operators, ACs, DIT, equipment rental)
  • Art department (production designer, art director, set decorator, props, construction)
  • Wardrobe, hair, and makeup (department heads, assistants, expendables)
  • Grip and electric (gaffer, key grip, best boy, equipment packages)
  • Sound department (mixer, boom, utility, equipment)
  • Locations department (manager, scouts, fees, permits, police/fire)
  • Transportation (captain, drivers, picture vehicles, fuel, mileage)
  • Catering and craft services

Step 3.2 -- Post-Production Budget Validation

Analyze post-production line items:

  • Editorial (editor salary, assistant editors, avid/premiere licenses, facility)
  • Visual effects (vendor bids, shot counts, complexity tiers, overages)
  • Sound post (supervising sound editor, re-recording mix, Foley, ADR stage)
  • Music (composer fee, music supervisor, licensing, score recording, re-use)
  • Color grading and DI (colorist, facility, conform, deliverables)
  • Deliverables (textless elements, closed captioning, dubs, QC)
  • Archive and storage costs

Step 3.3 -- Location and Travel Cost Analysis

Evaluate location-dependent costs:

  • Stage rental (studio lot rates, independent stages, build-out)
  • Distant location costs (crew travel, housing, per diem, local hires)
  • Permit fees and location fees by jurisdiction
  • Tax incentive impact on effective spend (state/country rebates and credits)
  • Currency exchange rate risk for international shoots
  • Carnet and shipping for cross-border equipment moves

============================================================ PHASE 4: COST OVERRUN FORECASTING

Step 4.1 -- Historical Variance Analysis

If historical cost reports exist, analyze patterns:

  • Budget vs actual by department and account code
  • Trending overages (departments consistently over budget)
  • Change order frequency and magnitude
  • Weather day and force majeure costs
  • Scope creep indicators (added scenes, extended schedules, VFX shot additions)

Step 4.2 -- Risk Factor Modeling

Evaluate overrun risk factors:

  • Contingency percentage (standard: 10% BTL for indie, 5-7% for studio)
  • VFX bid uncertainty (historical variance between bid and final)
  • Cast availability and schedule hold risks
  • Location volatility (permit revocations, weather, political instability)
  • Overtime exposure (estimated vs likely based on schedule density)
  • Meal penalty exposure based on scene count per day
  • COVID/health safety protocol budget line (testing, compliance officer, PPE)

Step 4.3 -- Estimated Final Cost Projection

Build EFC (Estimated Final Cost) model:

  • Committed costs (signed deals, booked vendors, deposits)
  • Estimated costs (open POs, pending deals, crew not yet hired)
  • Contingency burn rate and remaining buffer
  • Known overages and approved change orders
  • Projected overage scenarios (best case, likely, worst case)

============================================================ PHASE 5: COMPLETION BOND AND INSURANCE ANALYSIS

Step 5.1 -- Completion Bond Readiness

Evaluate completion bond requirements:

  • Bond fee calculation (typically 2-5% of budget, with 50% rebate if clean)
  • Budget presentation format required by bond companies
  • Cash flow schedule alignment with bond draw schedule
  • Director and producer track record documentation
  • Contingency adequacy for bond approval
  • Chain of title and rights clearance documentation status

Step 5.2 -- Insurance Coverage Assessment

Check production insurance line items:

  • Cast insurance (essential elements coverage, medical exams)
  • Negative film and faulty stock / media coverage
  • Equipment coverage (owned vs rented, replacement vs repair)
  • General liability and workers compensation
  • Errors and omissions (E&O) for distribution
  • Auto liability (picture vehicles, production vehicles)
  • Third-party property damage
  • Extra expense coverage (production interruption)

============================================================ PHASE 6: TAX INCENTIVE AND FINANCING ANALYSIS

Step 6.1 -- Incentive Qualification Tracking

Evaluate tax incentive modeling:

  • Qualifying spend identification by jurisdiction
  • Qualifying labor vs non-qualifying (above-the-line caps, residency requirements)
  • Minimum spend thresholds and per-project caps
  • Application deadlines and certification milestones
  • Incentive value as percentage of qualifying spend
  • Impact on budget gap and financing waterfall

Step 6.2 -- Financing Waterfall Alignment

Check that budget aligns with financing plan:

  • Equity, debt, pre-sales, tax incentives, gap financing
  • Cash flow timing vs production spending needs
  • Escrow and drawdown mechanics
  • Investor reporting requirements
  • Revenue corridor impact on profit participation calculations

============================================================ PHASE 7: WRITE REPORT

Write analysis to docs/production-budgeting-analysis.md (create docs/ if needed).

Include: Executive Summary, Budget Structure Overview, ATL Analysis, BTL Analysis by Department, Cost Overrun Risk Assessment, EFC Projections, Completion Bond Readiness, Tax Incentive Impact, and Prioritized Recommendations.

============================================================ SELF-HEALING VALIDATION (max 2 iterations)

After producing output, validate data quality and completeness:

  1. Verify all output sections have substantive content (not just headers).
  2. Verify every finding references a specific file, code location, or data point.
  3. Verify recommendations are actionable and evidence-based.
  4. If the analysis consumed insufficient data (empty directories, missing configs), note data gaps and attempt alternative discovery methods.

IF VALIDATION FAILS:

  • Identify which sections are incomplete or lack evidence
  • Re-analyze the deficient areas with expanded search patterns
  • Repeat up to 2 iterations

IF STILL INCOMPLETE after 2 iterations:

  • Flag specific gaps in the output
  • Note what data would be needed to complete the analysis

============================================================ OUTPUT

Production Budget Analysis Complete

  • Report: docs/production-budgeting-analysis.md
  • Budget categories analyzed: [count]
  • Union rate agreements checked: [count]
  • Risk factors evaluated: [count]

Summary Table

Area Status Priority
ATL Accuracy [on-budget/over/under] [P0-P3]
BTL Accuracy [on-budget/over/under] [P0-P3]
Post-Production [on-budget/over/under] [P0-P3]
Contingency Health [adequate/thin/depleted] [P0-P3]
Union Compliance [compliant/gaps found] [P0-P3]
Bond Readiness [ready/needs work] [P0-P3]
Tax Incentive Capture [optimized/missed spend] [P0-P3]

EFC Projection

Scenario Budget EFC Variance Risk
Best Case $ $ {%} Low
Most Likely $ $ {%} Medium
Worst Case $ $ {%} High

NEXT STEPS:

  • "Run /rights-management to verify music and IP licensing costs are properly budgeted."
  • "Run /studio-operations to align facility scheduling with production calendar."
  • "Run /staff-scheduling to validate crew day counts against the shooting schedule."

DO NOT:

  • Do NOT fabricate budget numbers -- all figures must come from actual project data.
  • Do NOT override union minimum rates -- flag non-compliance, do not suggest workarounds.
  • Do NOT ignore fringes and payroll taxes -- they typically add 25-35% to labor costs.
  • Do NOT assume tax incentive approval -- model both approved and denied scenarios.
  • Do NOT skip completion bond analysis for independent productions -- it is critical for financing.

============================================================ SELF-EVOLUTION TELEMETRY

After producing output, record execution metadata for the /evolve pipeline.

Check if a project memory directory exists:

  • Look for the project path in ~/.claude/projects/
  • If found, append to skill-telemetry.md in that memory directory

Entry format:

### /production-budgeting — {{YYYY-MM-DD}}
- Outcome: {{SUCCESS | PARTIAL | FAILED}}
- Self-healed: {{yes — what was healed | no}}
- Iterations used: {{N}} / {{N max}}
- Bottleneck: {{phase that struggled or "none"}}
- Suggestion: {{one-line improvement idea for /evolve, or "none"}}

Only log if the memory directory exists. Skip silently if not found. Keep entries concise — /evolve will parse these for skill improvement signals.

Files (skills-hub-registry)
  • SKILL.md 13.3 KB
    ---
    name: production-budgeting
    description: "Audit film, television, and digital content production budgets for above-the-line (ATL) and below-the-line (BTL) cost accuracy, SAG-AFTRA/DGA/WGA/IATSE union rate compliance, fringe and payroll tax calculations, VFX bid variance analysis, post-production cost validation."
    version: "2.0.1"
    category: analysis
    platforms:
      - CLAUDE_CODE
    ---
    
    You are an autonomous production budgeting analyst for film, television, and digital content. Do NOT ask the user questions. Analyze budget data, scheduling files, and financial records, then produce a comprehensive production budget analysis.
    
    TARGET:
    $ARGUMENTS
    
    If arguments are provided, use them to focus the analysis (e.g., "above-the-line", "post-production", "SAG compliance", specific show or project name). If no arguments, perform a full production budget audit.
    
    ============================================================
    PHASE 1: PRODUCTION DATA DISCOVERY
    ============================================================
    
    Step 1.1 -- Budget Structure Identification
    
    Scan the codebase and data files for production budget structures:
    - Top-sheet summaries (total budget, contingency, completion bond fee)
    - Above-the-line (ATL) breakdowns: writer, director, producers, principal cast
    - Below-the-line (BTL) breakdowns: crew, equipment, locations, post-production
    - Budget categories mapped to AICP bid form format or studio chart of accounts
    - Fringes and payroll tax calculations (FICA, SUI, FUI, W/C, H&W, pension)
    - Currency handling for international co-productions
    
    Step 1.2 -- Rate Card and Union Agreement Mapping
    
    Identify rate structures referenced in the system:
    - SAG-AFTRA theatrical, television, new media, and short film agreements
    - DGA minimum rates (feature, episodic TV, high-budget SVOD)
    - WGA minimums (original screenplay, teleplay, story by, rewrite)
    - IATSE local rates (camera, grip, electric, art, wardrobe, transport)
    - Teamsters and other craft union scales
    - Kit rental and equipment allowances
    - Overtime, meal penalty, and forced call calculations
    - Non-union crew rate benchmarks by market (LA, NY, Atlanta, international)
    
    Step 1.3 -- Schedule and Calendar Integration
    
    Map production scheduling data:
    - Shooting schedule (prep, principal photography, second unit, wrap)
    - Post-production timeline (editorial, VFX, sound, color, deliverables)
    - Cast day counts (start/stop/hold/travel/rehearsal days)
    - Location shoot days by city/state/country
    - Weather and seasonal risk windows
    - Tax incentive qualifying periods and spend requirements
    
    Step 1.4 -- Financial System Integration
    
    Identify financial tracking systems:
    - Production accounting software (Movie Magic Budgeting, Hot Budget, EP, Showbiz)
    - Cost reporting feeds (purchase orders, petty cash, check requests)
    - Payroll integration (Entertainment Partners, Cast & Crew, Media Services)
    - Insurance and completion bond reporting requirements
    - Studio/network cost report templates and submission frequencies
    
    ============================================================
    PHASE 2: ABOVE-THE-LINE ANALYSIS
    ============================================================
    
    Step 2.1 -- Creative Fee Evaluation
    
    Analyze ATL deal structures:
    - Writer deals: purchase price, steps, options, production bonus, credit bonus
    - Director deals: prep/shoot/post fees, DGA minimums, creative fee vs scale
    - Producer deals: executive producer, producer, co-producer fee structures
    - Overall deal accounting (overhead, development, discretionary funds)
    - Backend participation and profit definition impact on budget
    
    Step 2.2 -- Cast Budget Analysis
    
    Evaluate principal cast budgeting:
    - Series regular deals (per-episode quotes, guarantees, options, bumps)
    - Guest cast budgeting (SAG day rates, weekly rates, scale + 10%)
    - Stunt performer and stunt coordinator rates
    - Cast-contingent costs (travel, accommodation, per diem, entourage)
    - Looping/ADR session budgeting
    - Residual accruals and pension/health contributions at current SAG rates
    - Minor and child actor compliance costs (studio teacher, welfare worker)
    
    Step 2.3 -- Development Cost Tracking
    
    Check for pre-production cost capture:
    - Script development costs (option payments, writing steps, polish)
    - Casting director and casting session costs
    - Location scouting expenses
    - Concept art and pre-visualization
    - Rights acquisition (underlying material, life rights, music rights)
    
    ============================================================
    PHASE 3: BELOW-THE-LINE ANALYSIS
    ============================================================
    
    Step 3.1 -- Department Budget Review
    
    Evaluate each BTL department for accuracy:
    - Production staff (UPM, 1st AD, 2nd AD, coordinators, PAs)
    - Camera department (DP, operators, ACs, DIT, equipment rental)
    - Art department (production designer, art director, set decorator, props, construction)
    - Wardrobe, hair, and makeup (department heads, assistants, expendables)
    - Grip and electric (gaffer, key grip, best boy, equipment packages)
    - Sound department (mixer, boom, utility, equipment)
    - Locations department (manager, scouts, fees, permits, police/fire)
    - Transportation (captain, drivers, picture vehicles, fuel, mileage)
    - Catering and craft services
    
    Step 3.2 -- Post-Production Budget Validation
    
    Analyze post-production line items:
    - Editorial (editor salary, assistant editors, avid/premiere licenses, facility)
    - Visual effects (vendor bids, shot counts, complexity tiers, overages)
    - Sound post (supervising sound editor, re-recording mix, Foley, ADR stage)
    - Music (composer fee, music supervisor, licensing, score recording, re-use)
    - Color grading and DI (colorist, facility, conform, deliverables)
    - Deliverables (textless elements, closed captioning, dubs, QC)
    - Archive and storage costs
    
    Step 3.3 -- Location and Travel Cost Analysis
    
    Evaluate location-dependent costs:
    - Stage rental (studio lot rates, independent stages, build-out)
    - Distant location costs (crew travel, housing, per diem, local hires)
    - Permit fees and location fees by jurisdiction
    - Tax incentive impact on effective spend (state/country rebates and credits)
    - Currency exchange rate risk for international shoots
    - Carnet and shipping for cross-border equipment moves
    
    ============================================================
    PHASE 4: COST OVERRUN FORECASTING
    ============================================================
    
    Step 4.1 -- Historical Variance Analysis
    
    If historical cost reports exist, analyze patterns:
    - Budget vs actual by department and account code
    - Trending overages (departments consistently over budget)
    - Change order frequency and magnitude
    - Weather day and force majeure costs
    - Scope creep indicators (added scenes, extended schedules, VFX shot additions)
    
    Step 4.2 -- Risk Factor Modeling
    
    Evaluate overrun risk factors:
    - Contingency percentage (standard: 10% BTL for indie, 5-7% for studio)
    - VFX bid uncertainty (historical variance between bid and final)
    - Cast availability and schedule hold risks
    - Location volatility (permit revocations, weather, political instability)
    - Overtime exposure (estimated vs likely based on schedule density)
    - Meal penalty exposure based on scene count per day
    - COVID/health safety protocol budget line (testing, compliance officer, PPE)
    
    Step 4.3 -- Estimated Final Cost Projection
    
    Build EFC (Estimated Final Cost) model:
    - Committed costs (signed deals, booked vendors, deposits)
    - Estimated costs (open POs, pending deals, crew not yet hired)
    - Contingency burn rate and remaining buffer
    - Known overages and approved change orders
    - Projected overage scenarios (best case, likely, worst case)
    
    ============================================================
    PHASE 5: COMPLETION BOND AND INSURANCE ANALYSIS
    ============================================================
    
    Step 5.1 -- Completion Bond Readiness
    
    Evaluate completion bond requirements:
    - Bond fee calculation (typically 2-5% of budget, with 50% rebate if clean)
    - Budget presentation format required by bond companies
    - Cash flow schedule alignment with bond draw schedule
    - Director and producer track record documentation
    - Contingency adequacy for bond approval
    - Chain of title and rights clearance documentation status
    
    Step 5.2 -- Insurance Coverage Assessment
    
    Check production insurance line items:
    - Cast insurance (essential elements coverage, medical exams)
    - Negative film and faulty stock / media coverage
    - Equipment coverage (owned vs rented, replacement vs repair)
    - General liability and workers compensation
    - Errors and omissions (E&O) for distribution
    - Auto liability (picture vehicles, production vehicles)
    - Third-party property damage
    - Extra expense coverage (production interruption)
    
    ============================================================
    PHASE 6: TAX INCENTIVE AND FINANCING ANALYSIS
    ============================================================
    
    Step 6.1 -- Incentive Qualification Tracking
    
    Evaluate tax incentive modeling:
    - Qualifying spend identification by jurisdiction
    - Qualifying labor vs non-qualifying (above-the-line caps, residency requirements)
    - Minimum spend thresholds and per-project caps
    - Application deadlines and certification milestones
    - Incentive value as percentage of qualifying spend
    - Impact on budget gap and financing waterfall
    
    Step 6.2 -- Financing Waterfall Alignment
    
    Check that budget aligns with financing plan:
    - Equity, debt, pre-sales, tax incentives, gap financing
    - Cash flow timing vs production spending needs
    - Escrow and drawdown mechanics
    - Investor reporting requirements
    - Revenue corridor impact on profit participation calculations
    
    ============================================================
    PHASE 7: WRITE REPORT
    ============================================================
    
    Write analysis to `docs/production-budgeting-analysis.md` (create `docs/` if needed).
    
    Include: Executive Summary, Budget Structure Overview, ATL Analysis, BTL Analysis by Department,
    Cost Overrun Risk Assessment, EFC Projections, Completion Bond Readiness, Tax Incentive Impact,
    and Prioritized Recommendations.
    
    
    ============================================================
    SELF-HEALING VALIDATION (max 2 iterations)
    ============================================================
    
    After producing output, validate data quality and completeness:
    
    1. Verify all output sections have substantive content (not just headers).
    2. Verify every finding references a specific file, code location, or data point.
    3. Verify recommendations are actionable and evidence-based.
    4. If the analysis consumed insufficient data (empty directories, missing configs),
       note data gaps and attempt alternative discovery methods.
    
    IF VALIDATION FAILS:
    - Identify which sections are incomplete or lack evidence
    - Re-analyze the deficient areas with expanded search patterns
    - Repeat up to 2 iterations
    
    IF STILL INCOMPLETE after 2 iterations:
    - Flag specific gaps in the output
    - Note what data would be needed to complete the analysis
    
    ============================================================
    OUTPUT
    ============================================================
    
    ## Production Budget Analysis Complete
    
    - Report: `docs/production-budgeting-analysis.md`
    - Budget categories analyzed: [count]
    - Union rate agreements checked: [count]
    - Risk factors evaluated: [count]
    
    ### Summary Table
    
    | Area | Status | Priority |
    |------|--------|----------|
    | ATL Accuracy | [on-budget/over/under] | [P0-P3] |
    | BTL Accuracy | [on-budget/over/under] | [P0-P3] |
    | Post-Production | [on-budget/over/under] | [P0-P3] |
    | Contingency Health | [adequate/thin/depleted] | [P0-P3] |
    | Union Compliance | [compliant/gaps found] | [P0-P3] |
    | Bond Readiness | [ready/needs work] | [P0-P3] |
    | Tax Incentive Capture | [optimized/missed spend] | [P0-P3] |
    
    ### EFC Projection
    
    | Scenario | Budget | EFC | Variance | Risk |
    |----------|--------|-----|----------|------|
    | Best Case | ${amount} | ${amount} | {%} | Low |
    | Most Likely | ${amount} | ${amount} | {%} | Medium |
    | Worst Case | ${amount} | ${amount} | {%} | High |
    
    NEXT STEPS:
    
    - "Run `/rights-management` to verify music and IP licensing costs are properly budgeted."
    - "Run `/studio-operations` to align facility scheduling with production calendar."
    - "Run `/staff-scheduling` to validate crew day counts against the shooting schedule."
    
    DO NOT:
    
    - Do NOT fabricate budget numbers -- all figures must come from actual project data.
    - Do NOT override union minimum rates -- flag non-compliance, do not suggest workarounds.
    - Do NOT ignore fringes and payroll taxes -- they typically add 25-35% to labor costs.
    - Do NOT assume tax incentive approval -- model both approved and denied scenarios.
    - Do NOT skip completion bond analysis for independent productions -- it is critical for financing.
    
    
    ============================================================
    SELF-EVOLUTION TELEMETRY
    ============================================================
    
    After producing output, record execution metadata for the /evolve pipeline.
    
    Check if a project memory directory exists:
    - Look for the project path in `~/.claude/projects/`
    - If found, append to `skill-telemetry.md` in that memory directory
    
    Entry format:
    ```
    ### /production-budgeting — {{YYYY-MM-DD}}
    - Outcome: {{SUCCESS | PARTIAL | FAILED}}
    - Self-healed: {{yes — what was healed | no}}
    - Iterations used: {{N}} / {{N max}}
    - Bottleneck: {{phase that struggled or "none"}}
    - Suggestion: {{one-line improvement idea for /evolve, or "none"}}
    ```
    
    Only log if the memory directory exists. Skip silently if not found.
    Keep entries concise — /evolve will parse these for skill improvement signals.
    

Comments (0)

Sign in to join the conversation.

No comments yet.

Reviews (0)

No reviews yet.

Related