Claude Cursor GitHub Copilot Skill

planning-review-criteria

Use when reviewing DISCUSS artefacts (stories, acceptance criteria, sprint plans) for INVEST quality, planning coherence, and DoR compliance. Contains gate definitions G1-G8 and scoring rubric for the the backlog-planner review gate lenses.

LLM Mart · 0 points · 0 views 0 listing impressions 0 install-command copies
Download sebastiendegodez-skraft-plugin-plugins_skraft-backlog_skills_planning-review-criteria-c6117c6.zip · 22 KB

Install

skills CLI npx skills add https://github.com/SebastienDegodez/skraft-plugin/tree/main/plugins/skraft-backlog/skills/planning-review-criteria
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install sebastiendegodez-skraft-plugin@llmmart
Git git clone https://github.com/SebastienDegodez/skraft-plugin.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole sebastiendegodez/skraft-plugin collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

Planning Review Criteria

Overview

Formal gate definitions and verdict rubric for the review gate of backlog-planner. Applied across 4 lenses (invest, ac-quality, planning-coherence, dor-compliance) covering 8 gates (G1–G8).

A story that passes all 8 gates is approved to enter DESIGN. A story with any blocking finding is rejected and must return to DISCUSS.

Lens dispatch

The script of backlog-review-lenses takes phase discuss for a sprint of stories, and phase refine for the proposal on one issue (no coherence lens: there is no sprint to check). Each lens sees only these inputs:

Lens agent Inputs (discuss) Inputs (refine) Gates
planning-invest-lens stories file only proposal + issue text G1, G2
planning-ac-quality-lens AC drafts only — never the stories file the proposal's acceptance criteria only G3, G4
planning-coherence-lens sprint plan section + AC drafts — G5, G6
planning-dor-lens stories file + AC drafts proposal + issue text G7, G8

Each G7 defect names its story in story (in refine, the issue number): two G7 defects on one story make the verdict REJECTED.

Lens-to-question mapping

The synthesis in backlog-review-lenses is computed per question, not per lens. This mapping is declared here rather than derived at review time, because a mapping re-invented on each pass is a mapping that drifts.

Four lenses and four questions here, but the correspondence is not positional — read it:

Question Answered by Through
Completeness dor-compliance lens G7 — a story missing DoR items is a story DESIGN would have to guess at
Business Fit ac-quality lens G3, G4 — a criterion naming a Repository has stopped describing the business
Quality invest lens G1, G2 — INVEST is whether the story holds together as a unit of work
Risk planning-coherence lens G5, G6 — a cycle or a story spanning sprints is a delivery that fails downstream

In refine there is no coherence lens: the invest lens answers Risk through G2.

G8 (antipatterns) is checked by the dor-compliance lens but scores against Business Fit: Implement-X and Vague Persona are failures of business expression, not of readiness paperwork.


Gate Definitions (G1–G8)

Lens 1: invest-lens

Gate ID Definition Pass condition Severity
INVEST compliance G1 Each story satisfies all 6 INVEST criteria (Independent, Negotiable, Valuable, Estimable, Small, Testable). All criteria pass for every story. Any failing criterion is flagged by name. HIGH
Sprint independence G2 All stories are independently deliverable. No circular dependencies exist in the sprint. Dependency graph is a valid DAG. No story waits for a non-existent story. HIGH

Checking G1: For each story, verify each INVEST criterion individually. A single failing criterion = G1 fail for that story. Document which criterion and why.

Checking G2: Build an adjacency list from Dependencies fields. Run DFS. Any back-edge = cycle = G2 violation. Report the cycle path.


Lens 2: ac-quality-lens

Gate ID Definition Pass condition Severity
AC completeness G3 Every story has ≥3 ACs. Each AC is in Given/When/Then or bullet-list format. Zero ACs are implementation steps. 3+ ACs per story, correct format, no implementation prescriptions. HIGH
AC unambiguity G4 No AC has two valid interpretations by a domain expert with no code knowledge. Every AC resolves to a single unambiguous outcome. BLOCKER

G3 check steps:

  1. Count ACs per story — flag any story with fewer than 3
  2. For each AC, verify format: Given/When/Then or clean bullet list
  3. Scan for implementation instructions: method calls, HTTP verbs, class names → G3 violation

G4 red flags (auto-fail):

  • HTTP status codes: 200, 201, 422, 404, 500
  • HTTP verbs in step text: POST, GET, PUT, DELETE
  • Class/method names: EligibilityService, .Check(), DriverRepository
  • Framework terms: Controller, Handler, UseCase, DI container
  • Vague quantifiers without thresholds: "fast response", "good performance"
  • Dual-interpretation steps: "the driver is notified" (by email? by UI? by SMS?)

Lens 3: planning-coherence-lens

Gate ID Definition Pass condition Severity
Milestone scope G5 Stories fit the milestone theme. No story spans multiple sprint themes without decomposition. Every story aligns with the milestone's stated theme and time-box. HIGH
Dependency DAG G6 No circular dependencies. Delivery sequence respects topological order. Dependency graph is a DAG. Sequencing is derivable without ambiguity. BLOCKER

G5 check: For each story, ask: does this story's outcome belong in the milestone theme? If a story touches a different user journey segment than the milestone theme (e.g., a payment story in the v0.2-eligibility milestone), flag G5.

G6 cycle detection: Build adjacency list. DFS. Any back-edge = BLOCKER. Report the exact cycle: Story-A → Story-B → Story-C → Story-A.


Lens 4: dor-compliance-lens

Gate ID Definition Pass condition Severity
DoR 8-item gate G7 Every story passes ALL 8 DoR items: problem statement, specific persona, 3+ domain examples, UAT scenarios, AC derived from UAT, right-sized, technical notes, dependencies. 8/8 items pass for every story. BLOCKER
Antipattern absence G8 Zero CRITICAL antipatterns (Implement-X, Giant Stories, No Examples). Zero HIGH antipatterns (Technical AC, Generic Data, Tests After Code, Vague Persona, Missing Dependencies). No CRITICAL antipatterns detected. No HIGH antipatterns detected. BLOCKER (CRITICAL); HIGH (HIGH severity antipatterns)

G7 minimum verdict impact: If 2+ DoR items fail on the same story → that story's verdict is REJECTED regardless of other findings.

G8 auto-reject triggers:

  • Story persona is a developer/engineer/architect
  • Story capability verb is "implement", "build", "refactor", "create a service"
  • Story has 8+ ACs and no split plan
  • Story has zero domain examples with real values

INVEST Scoring Rubric

For each of the 6 INVEST criteria, this rubric defines what a passing story looks like.

Criterion Pass condition Fail conditions Failure severity Remediation
Independent Story has no unresolved implicit prerequisites. Any dependency is explicit and listed. Story references another story's output without listing it as a dependency. Story uses "continuing from..." HIGH List dependency explicitly, or split to make story self-contained
Negotiable Story describes observable user behaviour. No implementation technology prescribed. Story contains class/method names, HTTP contracts, framework prescriptions in the story body (not Technical Notes). HIGH Move implementation constraints to Technical Notes
Valuable Delivery of this story alone creates a user-visible or business-visible outcome. Story describes developer work only (refactoring, test coverage, migrations) with no user-visible outcome. HIGH Wrap technical work in user-visible consequence, or remove from DISCUSS
Estimable Team can size the story in ≤5 minutes with high confidence. ACs and Technical Notes are present. Story has no ACs. Story has major unknowns with no Technical Notes. Team disagrees on scope boundaries. HIGH Write ACs first; add spike story for unknowns; clarify scope
Small Effort is XS, S, or M. L is acceptable with tight ACs. XL is always a failure. Effort estimate is XL. Story has 6+ ACs. Story touches 3+ distinct user actions. HIGH (L with loose scope); BLOCKER (XL) Apply splitting pattern. XL must be split before DoR can be claimed.
Testable At least 3 ACs in G/W/T or bullet format derived from domain examples. No ACs written. ACs describe code quality, not user outcomes. AC says "works correctly". HIGH Add domain examples first; derive ACs from each example

AC Quality Rules

Apply to every AC in every ac-draft-{story}.md file:

Rule Description
One trigger per AC A Given/When/Then AC has exactly ONE When step. Multiple Whens = multiple ACs.
Observable outcome The Then step describes what the USER sees or experiences, never what happens inside the system.
Domain vocabulary only Every noun and verb in a G/W/T step must be understandable by a domain expert with no code knowledge.
Independent testability Each AC is independently verifiable. Two ACs do not test the same scenario.
Traceability Each AC traces to a domain example or UAT scenario. ACs without a source are fabrications.
Measurable conditions Quantitative ACs include thresholds: "within 2 seconds", "at least 3 attempts", not "quickly" or "several".

DoR Validation — Per-Item Severity

DoR Item Minimum severity if missing Minimum verdict if missing
1. Problem statement (Implement-X detected) BLOCKER REJECTED
2. Specific persona (Vague Persona detected) HIGH NEEDS_REWORK
3. 3+ domain examples (0 examples) BLOCKER REJECTED
3. 3+ domain examples (1-2 examples) HIGH NEEDS_REWORK
4. UAT scenarios HIGH NEEDS_REWORK
5. AC derived from UAT HIGH NEEDS_REWORK
6. Right-sized (XL estimate) BLOCKER (XL) / HIGH (L loose) REJECTED (XL) / NEEDS_REWORK (L)
7. Technical notes HIGH if integration exists NEEDS_REWORK
8. Dependencies (undeclared dependency found) HIGH NEEDS_REWORK

G7 aggregate rule: If a story has 2+ missing DoR items of any severity → minimum verdict is REJECTED.


Antipattern Severity Table

Antipattern ID Severity Lens Minimum verdict impact
Implement-X AP-DISCUSS-01 CRITICAL dor-compliance REJECTED
No Examples AP-DISCUSS-05 CRITICAL dor-compliance REJECTED
Giant Stories AP-DISCUSS-04 CRITICAL invest REJECTED
Technical AC AP-DISCUSS-03 HIGH ac-quality NEEDS_REWORK
Generic Data AP-DISCUSS-02 HIGH dor-compliance NEEDS_REWORK
Tests After Code AP-DISCUSS-06 HIGH ac-quality NEEDS_REWORK
Vague Persona AP-DISCUSS-07 HIGH dor-compliance NEEDS_REWORK
Missing Dependencies AP-DISCUSS-08 HIGH planning-coherence NEEDS_REWORK

Planning Red Flags

Patterns in sprint plans that signal a failing review, independent of individual story quality:

Red flag Impact Minimum verdict
All stories are Must Have with no Should/Could Haves Sprint has no flexibility to cut when overloaded NEEDS_REWORK (G5)
Total story-days > sustainable capacity Sprint is overloaded; engineers will cut corners NEEDS_REWORK (G5)
Two or more XL stories in the same sprint At least one XL was not split before planning REJECTED (G1 — Not Small)
Circular dependency in sprint Sprint cannot be delivered in topological order REJECTED (G6 — BLOCKER)
A story depends on a story not in the sprint with no "already done" confirmation Story B may start before Story A ships NEEDS_REWORK (G2)

Verdict Derivation Table

Condition Verdict
≥1 BLOCKER finding across any lens REJECTED
≥1 HIGH finding, 0 BLOCKER NEEDS_REWORK
MEDIUM findings only NEEDS_REWORK
LOW findings only APPROVED with recommendations
No findings APPROVED

Confidence levels:

  • high: All required artefacts present; all lenses fully applied
  • medium: Context artefacts (triage report) missing; some inferences made
  • low: Required artefacts partially missing; lenses applied on incomplete data

References

Files (skraft-plugin)
  • references
    • antipattern-severity.md 8 KB
      Loading…
    • dor-scoring.md 9 KB
      Loading…
    • gate-definitions.md 13.9 KB
      Loading…
    • invest-scoring.md 8 KB
      Loading…
    • verdict-rubric.md 8.4 KB
      Loading…
  • SKILL.md 12.6 KB
    ---
    name: planning-review-criteria
    description: Use when reviewing DISCUSS artefacts (stories, acceptance criteria, sprint plans) for INVEST quality, planning coherence, and DoR compliance. Contains gate definitions G1-G8 and scoring rubric for the the backlog-planner review gate lenses.
    ---
    
    # Planning Review Criteria
    
    ## Overview
    
    Formal gate definitions and verdict rubric for the review gate of `backlog-planner`. Applied across 4 lenses (invest, ac-quality, planning-coherence, dor-compliance) covering 8 gates (G1–G8).
    
    A story that passes all 8 gates is approved to enter DESIGN. A story with any blocking finding is rejected and must return to DISCUSS.
    
    ## Lens dispatch
    
    The script of `backlog-review-lenses` takes phase `discuss` for a sprint of stories, and phase
    `refine` for the proposal on one issue (no coherence lens: there is no sprint to check). Each
    lens sees only these inputs:
    
    | Lens agent | Inputs (`discuss`) | Inputs (`refine`) | Gates |
    |---|---|---|---|
    | `planning-invest-lens` | stories file only | proposal + issue text | G1, G2 |
    | `planning-ac-quality-lens` | AC drafts only — never the stories file | the proposal's acceptance criteria only | G3, G4 |
    | `planning-coherence-lens` | sprint plan section + AC drafts | — | G5, G6 |
    | `planning-dor-lens` | stories file + AC drafts | proposal + issue text | G7, G8 |
    
    Each G7 defect names its story in `story` (in `refine`, the issue number): two G7 defects on
    one story make the verdict REJECTED.
    
    ## Lens-to-question mapping
    
    The synthesis in `backlog-review-lenses` is computed per question, not per lens. This
    mapping is declared here rather than derived at review time, because a mapping re-invented on
    each pass is a mapping that drifts.
    
    Four lenses and four questions here, but the correspondence is not positional — read it:
    
    | Question | Answered by | Through |
    |---|---|---|
    | Completeness | dor-compliance lens | G7 — a story missing DoR items is a story DESIGN would have to guess at |
    | Business Fit | ac-quality lens | G3, G4 — a criterion naming a Repository has stopped describing the business |
    | Quality | invest lens | G1, G2 — INVEST is whether the story holds together as a unit of work |
    | Risk | planning-coherence lens | G5, G6 — a cycle or a story spanning sprints is a delivery that fails downstream |
    
    In `refine` there is no coherence lens: the invest lens answers **Risk** through G2.
    
    G8 (antipatterns) is checked by the dor-compliance lens but scores against **Business Fit**:
    Implement-X and Vague Persona are failures of business expression, not of readiness paperwork.
    
    ---
    
    ## Gate Definitions (G1–G8)
    
    ### Lens 1: invest-lens
    
    | Gate | ID | Definition | Pass condition | Severity |
    |---|---|---|---|---|
    | INVEST compliance | G1 | Each story satisfies all 6 INVEST criteria (Independent, Negotiable, Valuable, Estimable, Small, Testable). | All criteria pass for every story. Any failing criterion is flagged by name. | HIGH |
    | Sprint independence | G2 | All stories are independently deliverable. No circular dependencies exist in the sprint. | Dependency graph is a valid DAG. No story waits for a non-existent story. | HIGH |
    
    **Checking G1:** For each story, verify each INVEST criterion individually. A single failing criterion = G1 fail for that story. Document which criterion and why.
    
    **Checking G2:** Build an adjacency list from `Dependencies` fields. Run DFS. Any back-edge = cycle = G2 violation. Report the cycle path.
    
    ---
    
    ### Lens 2: ac-quality-lens
    
    | Gate | ID | Definition | Pass condition | Severity |
    |---|---|---|---|---|
    | AC completeness | G3 | Every story has ≥3 ACs. Each AC is in Given/When/Then or bullet-list format. Zero ACs are implementation steps. | 3+ ACs per story, correct format, no implementation prescriptions. | HIGH |
    | AC unambiguity | G4 | No AC has two valid interpretations by a domain expert with no code knowledge. | Every AC resolves to a single unambiguous outcome. | BLOCKER |
    
    **G3 check steps:**
    1. Count ACs per story — flag any story with fewer than 3
    2. For each AC, verify format: Given/When/Then or clean bullet list
    3. Scan for implementation instructions: method calls, HTTP verbs, class names → G3 violation
    
    **G4 red flags (auto-fail):**
    - HTTP status codes: `200`, `201`, `422`, `404`, `500`
    - HTTP verbs in step text: `POST`, `GET`, `PUT`, `DELETE`
    - Class/method names: `EligibilityService`, `.Check()`, `DriverRepository`
    - Framework terms: `Controller`, `Handler`, `UseCase`, `DI container`
    - Vague quantifiers without thresholds: "fast response", "good performance"
    - Dual-interpretation steps: "the driver is notified" (by email? by UI? by SMS?)
    
    ---
    
    ### Lens 3: planning-coherence-lens
    
    | Gate | ID | Definition | Pass condition | Severity |
    |---|---|---|---|---|
    | Milestone scope | G5 | Stories fit the milestone theme. No story spans multiple sprint themes without decomposition. | Every story aligns with the milestone's stated theme and time-box. | HIGH |
    | Dependency DAG | G6 | No circular dependencies. Delivery sequence respects topological order. | Dependency graph is a DAG. Sequencing is derivable without ambiguity. | BLOCKER |
    
    **G5 check:** For each story, ask: does this story's outcome belong in the milestone theme? If a story touches a different user journey segment than the milestone theme (e.g., a payment story in the `v0.2-eligibility` milestone), flag G5.
    
    **G6 cycle detection:** Build adjacency list. DFS. Any back-edge = BLOCKER. Report the exact cycle: `Story-A → Story-B → Story-C → Story-A`.
    
    ---
    
    ### Lens 4: dor-compliance-lens
    
    | Gate | ID | Definition | Pass condition | Severity |
    |---|---|---|---|---|
    | DoR 8-item gate | G7 | Every story passes ALL 8 DoR items: problem statement, specific persona, 3+ domain examples, UAT scenarios, AC derived from UAT, right-sized, technical notes, dependencies. | 8/8 items pass for every story. | BLOCKER |
    | Antipattern absence | G8 | Zero CRITICAL antipatterns (Implement-X, Giant Stories, No Examples). Zero HIGH antipatterns (Technical AC, Generic Data, Tests After Code, Vague Persona, Missing Dependencies). | No CRITICAL antipatterns detected. No HIGH antipatterns detected. | BLOCKER (CRITICAL); HIGH (HIGH severity antipatterns) |
    
    **G7 minimum verdict impact:** If 2+ DoR items fail on the same story → that story's verdict is `REJECTED` regardless of other findings.
    
    **G8 auto-reject triggers:**
    - Story persona is a developer/engineer/architect
    - Story capability verb is "implement", "build", "refactor", "create a service"
    - Story has 8+ ACs and no split plan
    - Story has zero domain examples with real values
    
    ---
    
    ## INVEST Scoring Rubric
    
    For each of the 6 INVEST criteria, this rubric defines what a passing story looks like.
    
    | Criterion | Pass condition | Fail conditions | Failure severity | Remediation |
    |---|---|---|---|---|
    | **Independent** | Story has no unresolved implicit prerequisites. Any dependency is explicit and listed. | Story references another story's output without listing it as a dependency. Story uses "continuing from..." | HIGH | List dependency explicitly, or split to make story self-contained |
    | **Negotiable** | Story describes observable user behaviour. No implementation technology prescribed. | Story contains class/method names, HTTP contracts, framework prescriptions in the story body (not Technical Notes). | HIGH | Move implementation constraints to Technical Notes |
    | **Valuable** | Delivery of this story alone creates a user-visible or business-visible outcome. | Story describes developer work only (refactoring, test coverage, migrations) with no user-visible outcome. | HIGH | Wrap technical work in user-visible consequence, or remove from DISCUSS |
    | **Estimable** | Team can size the story in ≤5 minutes with high confidence. ACs and Technical Notes are present. | Story has no ACs. Story has major unknowns with no Technical Notes. Team disagrees on scope boundaries. | HIGH | Write ACs first; add spike story for unknowns; clarify scope |
    | **Small** | Effort is XS, S, or M. L is acceptable with tight ACs. XL is always a failure. | Effort estimate is XL. Story has 6+ ACs. Story touches 3+ distinct user actions. | HIGH (L with loose scope); BLOCKER (XL) | Apply splitting pattern. XL must be split before DoR can be claimed. |
    | **Testable** | At least 3 ACs in G/W/T or bullet format derived from domain examples. | No ACs written. ACs describe code quality, not user outcomes. AC says "works correctly". | HIGH | Add domain examples first; derive ACs from each example |
    
    ---
    
    ## AC Quality Rules
    
    Apply to every AC in every `ac-draft-{story}.md` file:
    
    | Rule | Description |
    |---|---|
    | **One trigger per AC** | A Given/When/Then AC has exactly ONE When step. Multiple Whens = multiple ACs. |
    | **Observable outcome** | The Then step describes what the USER sees or experiences, never what happens inside the system. |
    | **Domain vocabulary only** | Every noun and verb in a G/W/T step must be understandable by a domain expert with no code knowledge. |
    | **Independent testability** | Each AC is independently verifiable. Two ACs do not test the same scenario. |
    | **Traceability** | Each AC traces to a domain example or UAT scenario. ACs without a source are fabrications. |
    | **Measurable conditions** | Quantitative ACs include thresholds: "within 2 seconds", "at least 3 attempts", not "quickly" or "several". |
    
    ---
    
    ## DoR Validation — Per-Item Severity
    
    | DoR Item | Minimum severity if missing | Minimum verdict if missing |
    |---|---|---|
    | 1. Problem statement (Implement-X detected) | BLOCKER | `REJECTED` |
    | 2. Specific persona (Vague Persona detected) | HIGH | `NEEDS_REWORK` |
    | 3. 3+ domain examples (0 examples) | BLOCKER | `REJECTED` |
    | 3. 3+ domain examples (1-2 examples) | HIGH | `NEEDS_REWORK` |
    | 4. UAT scenarios | HIGH | `NEEDS_REWORK` |
    | 5. AC derived from UAT | HIGH | `NEEDS_REWORK` |
    | 6. Right-sized (XL estimate) | BLOCKER (XL) / HIGH (L loose) | `REJECTED` (XL) / `NEEDS_REWORK` (L) |
    | 7. Technical notes | HIGH if integration exists | `NEEDS_REWORK` |
    | 8. Dependencies (undeclared dependency found) | HIGH | `NEEDS_REWORK` |
    
    **G7 aggregate rule:** If a story has 2+ missing DoR items of any severity → minimum verdict is `REJECTED`.
    
    ---
    
    ## Antipattern Severity Table
    
    | Antipattern | ID | Severity | Lens | Minimum verdict impact |
    |---|---|---|---|---|
    | Implement-X | AP-DISCUSS-01 | CRITICAL | dor-compliance | `REJECTED` |
    | No Examples | AP-DISCUSS-05 | CRITICAL | dor-compliance | `REJECTED` |
    | Giant Stories | AP-DISCUSS-04 | CRITICAL | invest | `REJECTED` |
    | Technical AC | AP-DISCUSS-03 | HIGH | ac-quality | `NEEDS_REWORK` |
    | Generic Data | AP-DISCUSS-02 | HIGH | dor-compliance | `NEEDS_REWORK` |
    | Tests After Code | AP-DISCUSS-06 | HIGH | ac-quality | `NEEDS_REWORK` |
    | Vague Persona | AP-DISCUSS-07 | HIGH | dor-compliance | `NEEDS_REWORK` |
    | Missing Dependencies | AP-DISCUSS-08 | HIGH | planning-coherence | `NEEDS_REWORK` |
    
    ---
    
    ## Planning Red Flags
    
    Patterns in sprint plans that signal a failing review, independent of individual story quality:
    
    | Red flag | Impact | Minimum verdict |
    |---|---|---|
    | All stories are Must Have with no Should/Could Haves | Sprint has no flexibility to cut when overloaded | `NEEDS_REWORK` (G5) |
    | Total story-days > sustainable capacity | Sprint is overloaded; engineers will cut corners | `NEEDS_REWORK` (G5) |
    | Two or more XL stories in the same sprint | At least one XL was not split before planning | `REJECTED` (G1 — Not Small) |
    | Circular dependency in sprint | Sprint cannot be delivered in topological order | `REJECTED` (G6 — BLOCKER) |
    | A story depends on a story not in the sprint with no "already done" confirmation | Story B may start before Story A ships | `NEEDS_REWORK` (G2) |
    
    ---
    
    ## Verdict Derivation Table
    
    | Condition | Verdict |
    |---|---|
    | ≥1 BLOCKER finding across any lens | `REJECTED` |
    | ≥1 HIGH finding, 0 BLOCKER | `NEEDS_REWORK` |
    | MEDIUM findings only | `NEEDS_REWORK` |
    | LOW findings only | `APPROVED` with recommendations |
    | No findings | `APPROVED` |
    
    **Confidence levels:**
    - `high`: All required artefacts present; all lenses fully applied
    - `medium`: Context artefacts (triage report) missing; some inferences made
    - `low`: Required artefacts partially missing; lenses applied on incomplete data
    
    ---
    
    ## References
    
    - [gate-definitions.md](references/gate-definitions.md) — G1-G8 per-gate checklists with pass/fail examples
    - [invest-scoring.md](references/invest-scoring.md) — INVEST per-criterion scoring rubric
    - [dor-scoring.md](references/dor-scoring.md) — DoR per-item rubric with severity table
    - [antipattern-severity.md](references/antipattern-severity.md) — antipattern detection checklist and verdict impact
    - [verdict-rubric.md](references/verdict-rubric.md) — verdict derivation with 3 example verdicts
    

Comments (0)

Sign in to join the conversation.

No comments yet.

Reviews (0)

No reviews yet.