Claude Cursor Skill

nasa-hsi

Knowledge base from NASA Human Systems Integration (HSI) Practitioner's Guide (NASA/SP-2015-3709). Use for HSI process implementation, lifecycle phase activities, function allocation, ConOps development, HSI Plan writing, HSI metrics (MOE/MOP/TPM/KPP), HITL testing strategy, HSI

LLM Mart · 0 points · 3 views 0 listing impressions 0 install-command copies
Download jgsystemsconsulting-jgs-se-knowledge-packs-packs_nasa-hsi-3bf1e13.zip · 40 KB

Install

skills CLI npx skills add https://github.com/jgsystemsconsulting/jgs-se-knowledge-packs/tree/main/packs/nasa-hsi
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install jgsystemsconsulting-jgs-se-knowledge-packs@llmmart
Git git clone https://github.com/jgsystemsconsulting/jgs-se-knowledge-packs.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole jgsystemsconsulting/jgs-se-knowledge-packs collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

NASA Human Systems Integration (HSI) Practitioner's Guide (NASA/SP-2015-3709)

Source: NASA (US Government work, public domain) | Chapters: 9

When to use

Use this skill when planning, scoping, or executing HSI within a NASA systems engineering lifecycle — from first concept studies through decommissioning. It answers "when do I do what", "what products are due at which milestone", and "how do I scale HSI to my program size." It is the practitioner's process companion, not a human factors design reference; for specific ergonomic or human performance standards, consult NASA-STD-3001 and the HIDH directly.

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below and the HSI lifecycle overview.
  • With a topic — ask about ConOps, function allocation, HSI Plan, HITL testing, crew time KPP, COTS screening, V&V pre-declaration, lessons learned; I read the relevant chapter.
  • With a phase — ask about "Pre-Phase A", "Phase B", "Phase D", "Phase E"; I provide the HSI activities and milestone deliverables for that phase.
  • With a chapter — ask for ch01 through ch09.

Supporting files: glossary.md, patterns.md, cheatsheet.md.

Core Frameworks & Mental Models

1. Four HSI Key Concepts (Ch 1)

  1. System = hardware + software + human — all three sub-systems have equal standing.
  2. All personnel, all lifecycle — users, operators, maintainers, trainers, logistics, ground control.
  3. Integration and collaboration — HSI resolves cross-domain conflicts before program management must engage.
  4. Early is mandatory — LCC is locked in during early phases; Pre-Phase A HSI yields the greatest cost savings.

2. NASA HSI Domains (Ch 1)

Domain Core Focus
Human Factors Engineering (HFE) Capabilities/limitations → hardware/software design
Operations Resources Flight and ground crew operations planning
Maintainability and Supportability Maintenance design, logistics, spares
Habitability and Environment Living/working conditions, health, environment
Safety Hazard controls, human rating, survivability
Training Instructional design, training resource minimisation

3. HSI in the Systems Engineering Engine (Ch 3)

HSI runs in lock-step with the 17 NASA SEE processes (NPR 7123.1B). Key mapping:

  • SEE 1–4 (Design): ConOps, function allocation, requirements, HITL-informed design
  • SEE 5–9 (Realization): Prototyping, integration, HITL V&V, operations transition
  • SEE 10–17 (Management): HSI plan, risk management, metrics, milestone reviews

4. Lifecycle Phase HSI Activities Summary

Phase Gate Primary HSI Actions
Pre-Phase A MCR ConOps draft; function allocation; MOEs; HSI planning initiated
Phase A SRR/SDR ConOps baseline; HSI team formed; requirements baseline; MOPs/TPMs
Phase B PDR HITL intensified; requirements refined; V&V framework established
Phase C CDR/PRR/SIR Design finalised; production/training plans; V&V activities maturing
Phase D TRR/SAR/ORR/FRR V&V closure; Human Rating Certification Package; operational products
Phase E PLAR/CERR/PFAR/DR In-mission monitoring; lessons learned; sustaining engineering
Phase F DRR Decommissioning support; final knowledge archiving

5. HSI Metrics Cascade

MOE (stakeholder satisfaction criterion, Pre-Phase A) → MOP (engineering-level measure, Phase A) → TPM (tracked margin, Phase A through Phase E) → KPP (program-level threshold/objective, e.g. crew time ≤40%/≤35%)

6. HSI Scaling (Ch 7)

Scale Safety Human Involvement Plan Format
Large Category I / human-rated / life-sustaining Tight coupling; crew "lives in the product" Standalone HSI Plan
Medium Category II / modest risk Moderate coupling; crew essential HSI in SEMP
Small Category III / low risk Loose coupling; some automation Project documents

Rule: Scale by safety and human involvement, NOT by budget.

7. HSI Plan Structure (Ch 8, Ch 9)

  1. Introduction (Purpose, Scope, Definitions)
  2. Applicable Documents
  3. HSI Objectives (System Description + HSI Relevance)
  4. HSI Strategy (Summary + Domains)
  5. HSI Requirements, Organisation, and Risk Management
  6. HSI Implementation (Activities, Products, Update Schedule)

8. Three Technical Authorities (Ch 2)

  • ETA (OCE) → NPR 7123.1B; engineering design oversight
  • SMA TA (OSMA) → NPR 8705.2B; safety and human-rating mandate
  • HMTA (OCHMO) → NASA-STD-3001; health and medical standards

Chapter Index

# Section Key content
ch01 Introduction to HSI Four key concepts, HSI domains, HFE/HCD/HSI distinctions, LCC motivation
ch02 Implementing HSI Three TAs (ETA/SMA/HMTA), control boards, IPT collaboration, HSI tools
ch03 HSI in the SEE Engine 17 SEE processes, Product Maturity Matrix, ConOps, function allocation, MOE→MOP→TPM
ch04 Pre-Phase A and Phase A MCR/SRR/SDR deliverables, HITL mockups, function allocation, HSI team formation
ch05 Phases B and C PDR/CDR activities, HITL intensification, V&V pre-declaration, design finalisation
ch06 Phases D, E, and F V&V closure, Human Rating Certification Package, operational monitoring, lessons learned
ch07 Products, Scaling, Tailoring Three-tier scaling, COTS assessment, crew time KPP, Agile integration
ch08 HSI Plan Writing and Execution HSI Plan structure, ConOps development, SME integration, requirements derivation, metrics
ch09 Appendices: Plan, Checklist, Cases Appendix A annotated outline, Appendix B checklist, Appendix C case studies (F-22, Shuttle, ISS, Constellation)

Topic Index

  • ConOps development → ch03, ch04, ch08
  • COTS screening → ch07
  • Crew time KPP → ch07, ch08
  • Function allocation → ch03, ch04, ch08
  • HITL testing → ch03, ch04, ch05, ch06
  • HSI Plan writing → ch08, ch09
  • HSI scaling and tailoring → ch07
  • HSI team formation → ch02, ch04
  • Lifecycle milestone deliverables → ch03, ch04, ch05, ch06
  • LCC and cost avoidance → ch01, ch07, ch08
  • Metrics (MOE/MOP/TPM/KPP) → ch03, ch08
  • Phase D V&V closure → ch06
  • Pre-declaration → ch05, ch06
  • Requirements development → ch08
  • SME integration → ch02, ch08
  • Technical authorities → ch02
  • Training domain → ch01, ch08

Supporting Files

  • glossary.md — ~50 terms with chapter references, from CDR to V&V
  • patterns.md — 13 reusable when/how/trade-off patterns for HSI practice
  • cheatsheet.md — decision rules, milestone map, tells-and-smells, four key concepts

Scope & Limits

This skill covers the NASA HSI process and management framework as documented in NASA/SP-2015-3709: HSI lifecycle phases, SEE integration, product maturity, scaling, HSI Plan structure, metrics, V&V strategy, and program case studies. It does not cover the detailed engineering design standards in NASA-STD-3001 (human factors design requirements for space systems), the HIDH human performance data, or specific HFE analysis methodologies beyond what the Practitioner's Guide itself describes. This is a US Government public domain work (NASA); no copyright restriction applies.

Files (jgs-se-knowledge-packs)
  • chapters
    • ch01-introduction-to-hsi.md 5.6 KB
      Loading…
    • ch02-implementing-hsi.md 5.4 KB
      Loading…
    • ch03-hsi-in-the-see-engine.md 5.5 KB
      Loading…
    • ch04-pre-phase-a-and-phase-a.md 5.6 KB
      Loading…
    • ch05-phases-b-and-c.md 6.1 KB
      Loading…
    • ch06-phases-d-e-f.md 6.5 KB
      Loading…
    • ch07-hsi-products-scaling-tailoring.md 6.9 KB
      Loading…
    • ch08-hsi-plan-writing-and-execution.md 7.5 KB
      Loading…
    • ch09-appendices-hsi-plan-checklist-cases.md 7.5 KB
      Loading…
  • cheatsheet.md 5.5 KB
    Loading…
  • glossary.md 10.2 KB
    Loading…
  • LICENSE 977 B · in bundle
  • PACK.yaml 917 B
    Loading…
  • patterns.md 9.5 KB
    Loading…
  • SKILL.md 8.3 KB
    ---
    name: nasa-hsi
    description: "Knowledge base from NASA Human Systems Integration (HSI) Practitioner's Guide (NASA/SP-2015-3709). Use for HSI process implementation, lifecycle phase activities, function allocation, ConOps development, HSI Plan writing, HSI metrics (MOE/MOP/TPM/KPP), HITL testing strategy, HSI team organisation, scaling/tailoring for program size, and V&V planning. Does not cover the specific human engineering design standards (NASA-STD-3001 content) or detailed HFE methods beyond what the guide itself provides."
    ---
    
    <!-- argument-hint: [topic, phase, or chapter number] -->
    
    # NASA Human Systems Integration (HSI) Practitioner's Guide (NASA/SP-2015-3709)
    **Source**: NASA (US Government work, public domain) | **Chapters**: 9
    
    ## When to use
    Use this skill when planning, scoping, or executing HSI within a NASA systems engineering lifecycle — from first concept studies through decommissioning. It answers "when do I do what", "what products are due at which milestone", and "how do I scale HSI to my program size." It is the practitioner's process companion, not a human factors design reference; for specific ergonomic or human performance standards, consult NASA-STD-3001 and the HIDH directly.
    
    **Prerequisites:** none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.
    
    ## How to Use This Skill
    - **Without arguments** — load the core frameworks below and the HSI lifecycle overview.
    - **With a topic** — ask about ConOps, function allocation, HSI Plan, HITL testing, crew time KPP, COTS screening, V&V pre-declaration, lessons learned; I read the relevant chapter.
    - **With a phase** — ask about "Pre-Phase A", "Phase B", "Phase D", "Phase E"; I provide the HSI activities and milestone deliverables for that phase.
    - **With a chapter** — ask for `ch01` through `ch09`.
    
    Supporting files: `glossary.md`, `patterns.md`, `cheatsheet.md`.
    
    ## Core Frameworks & Mental Models
    
    ### 1. Four HSI Key Concepts (Ch 1)
    1. **System = hardware + software + human** — all three sub-systems have equal standing.
    2. **All personnel, all lifecycle** — users, operators, maintainers, trainers, logistics, ground control.
    3. **Integration and collaboration** — HSI resolves cross-domain conflicts before program management must engage.
    4. **Early is mandatory** — LCC is locked in during early phases; Pre-Phase A HSI yields the greatest cost savings.
    
    ### 2. NASA HSI Domains (Ch 1)
    | Domain | Core Focus |
    |---|---|
    | Human Factors Engineering (HFE) | Capabilities/limitations → hardware/software design |
    | Operations Resources | Flight and ground crew operations planning |
    | Maintainability and Supportability | Maintenance design, logistics, spares |
    | Habitability and Environment | Living/working conditions, health, environment |
    | Safety | Hazard controls, human rating, survivability |
    | Training | Instructional design, training resource minimisation |
    
    ### 3. HSI in the Systems Engineering Engine (Ch 3)
    HSI runs in lock-step with the 17 NASA SEE processes (NPR 7123.1B). Key mapping:
    - **SEE 1–4 (Design)**: ConOps, function allocation, requirements, HITL-informed design
    - **SEE 5–9 (Realization)**: Prototyping, integration, HITL V&V, operations transition
    - **SEE 10–17 (Management)**: HSI plan, risk management, metrics, milestone reviews
    
    ### 4. Lifecycle Phase HSI Activities Summary
    | Phase | Gate | Primary HSI Actions |
    |---|---|---|
    | Pre-Phase A | MCR | ConOps draft; function allocation; MOEs; HSI planning initiated |
    | Phase A | SRR/SDR | ConOps baseline; HSI team formed; requirements baseline; MOPs/TPMs |
    | Phase B | PDR | HITL intensified; requirements refined; V&V framework established |
    | Phase C | CDR/PRR/SIR | Design finalised; production/training plans; V&V activities maturing |
    | Phase D | TRR/SAR/ORR/FRR | V&V closure; Human Rating Certification Package; operational products |
    | Phase E | PLAR/CERR/PFAR/DR | In-mission monitoring; lessons learned; sustaining engineering |
    | Phase F | DRR | Decommissioning support; final knowledge archiving |
    
    ### 5. HSI Metrics Cascade
    **MOE** (stakeholder satisfaction criterion, Pre-Phase A)
    → **MOP** (engineering-level measure, Phase A)
    → **TPM** (tracked margin, Phase A through Phase E)
    → **KPP** (program-level threshold/objective, e.g. crew time ≤40%/≤35%)
    
    ### 6. HSI Scaling (Ch 7)
    | Scale | Safety | Human Involvement | Plan Format |
    |---|---|---|---|
    | Large | Category I / human-rated / life-sustaining | Tight coupling; crew "lives in the product" | Standalone HSI Plan |
    | Medium | Category II / modest risk | Moderate coupling; crew essential | HSI in SEMP |
    | Small | Category III / low risk | Loose coupling; some automation | Project documents |
    
    **Rule**: Scale by safety and human involvement, NOT by budget.
    
    ### 7. HSI Plan Structure (Ch 8, Ch 9)
    1. Introduction (Purpose, Scope, Definitions)
    2. Applicable Documents
    3. HSI Objectives (System Description + HSI Relevance)
    4. HSI Strategy (Summary + Domains)
    5. HSI Requirements, Organisation, and Risk Management
    6. HSI Implementation (Activities, Products, Update Schedule)
    
    ### 8. Three Technical Authorities (Ch 2)
    - **ETA** (OCE) → NPR 7123.1B; engineering design oversight
    - **SMA TA** (OSMA) → NPR 8705.2B; safety and human-rating mandate
    - **HMTA** (OCHMO) → NASA-STD-3001; health and medical standards
    
    ---
    
    ## Chapter Index
    | # | Section | Key content |
    |---|---------|-------------|
    | [ch01](chapters/ch01-introduction-to-hsi.md) | Introduction to HSI | Four key concepts, HSI domains, HFE/HCD/HSI distinctions, LCC motivation |
    | [ch02](chapters/ch02-implementing-hsi.md) | Implementing HSI | Three TAs (ETA/SMA/HMTA), control boards, IPT collaboration, HSI tools |
    | [ch03](chapters/ch03-hsi-in-the-see-engine.md) | HSI in the SEE Engine | 17 SEE processes, Product Maturity Matrix, ConOps, function allocation, MOE→MOP→TPM |
    | [ch04](chapters/ch04-pre-phase-a-and-phase-a.md) | Pre-Phase A and Phase A | MCR/SRR/SDR deliverables, HITL mockups, function allocation, HSI team formation |
    | [ch05](chapters/ch05-phases-b-and-c.md) | Phases B and C | PDR/CDR activities, HITL intensification, V&V pre-declaration, design finalisation |
    | [ch06](chapters/ch06-phases-d-e-f.md) | Phases D, E, and F | V&V closure, Human Rating Certification Package, operational monitoring, lessons learned |
    | [ch07](chapters/ch07-hsi-products-scaling-tailoring.md) | Products, Scaling, Tailoring | Three-tier scaling, COTS assessment, crew time KPP, Agile integration |
    | [ch08](chapters/ch08-hsi-plan-writing-and-execution.md) | HSI Plan Writing and Execution | HSI Plan structure, ConOps development, SME integration, requirements derivation, metrics |
    | [ch09](chapters/ch09-appendices-hsi-plan-checklist-cases.md) | Appendices: Plan, Checklist, Cases | Appendix A annotated outline, Appendix B checklist, Appendix C case studies (F-22, Shuttle, ISS, Constellation) |
    
    ## Topic Index
    - **ConOps development** → ch03, ch04, ch08
    - **COTS screening** → ch07
    - **Crew time KPP** → ch07, ch08
    - **Function allocation** → ch03, ch04, ch08
    - **HITL testing** → ch03, ch04, ch05, ch06
    - **HSI Plan writing** → ch08, ch09
    - **HSI scaling and tailoring** → ch07
    - **HSI team formation** → ch02, ch04
    - **Lifecycle milestone deliverables** → ch03, ch04, ch05, ch06
    - **LCC and cost avoidance** → ch01, ch07, ch08
    - **Metrics (MOE/MOP/TPM/KPP)** → ch03, ch08
    - **Phase D V&V closure** → ch06
    - **Pre-declaration** → ch05, ch06
    - **Requirements development** → ch08
    - **SME integration** → ch02, ch08
    - **Technical authorities** → ch02
    - **Training domain** → ch01, ch08
    
    ## Supporting Files
    - [glossary.md](glossary.md) — ~50 terms with chapter references, from CDR to V&V
    - [patterns.md](patterns.md) — 13 reusable when/how/trade-off patterns for HSI practice
    - [cheatsheet.md](cheatsheet.md) — decision rules, milestone map, tells-and-smells, four key concepts
    
    ---
    
    ## Scope & Limits
    This skill covers the NASA HSI process and management framework as documented in NASA/SP-2015-3709: HSI lifecycle phases, SEE integration, product maturity, scaling, HSI Plan structure, metrics, V&V strategy, and program case studies. It does not cover the detailed engineering design standards in NASA-STD-3001 (human factors design requirements for space systems), the HIDH human performance data, or specific HFE analysis methodologies beyond what the Practitioner's Guide itself describes. This is a US Government public domain work (NASA); no copyright restriction applies.
    

Comments (0)

Sign in to join the conversation.

No comments yet.

Reviews (0)

No reviews yet.