Knowledge base from the DOE Order on Program and Project Management for the Acquisition of Capital Assets (DOE O 413.3 series). Use for Critical Decisions CD-0–CD-4, performance baselines, acquisition strategy and IPTs, cost/schedule/EVMS/PARS controls, risk-informed governance,

LLM Mart · 0 points · 1 views 0 listing impressions 0 install-command copies
Download jgsystemsconsulting-jgs-se-knowledge-packs-packs_doe-o-413-3-3bf1e13.zip · 16 KB

Install

skills CLI npx skills add https://github.com/jgsystemsconsulting/jgs-se-knowledge-packs/tree/main/packs/doe-o-413-3
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install jgsystemsconsulting-jgs-se-knowledge-packs@llmmart
Git git clone https://github.com/jgsystemsconsulting/jgs-se-knowledge-packs.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole jgsystemsconsulting/jgs-se-knowledge-packs collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

DOE Capital Asset Project Management (O 413.3 series)

Source: DOE O 413.3C (2026-08-05; cancels O 413.3B Chg 7) (US Government work, public domain) | Chapters: 6

When to use

Reach for this pack when planning, governing, or reviewing DOE/NNSA capital asset projects under the 413.3 Order family — mission need through completion, Critical Decision gates, performance baselines, acquisition strategy and IPTs, EVMS/PARS reporting, risk-informed approvals, exemptions, and contractor requirements flow-down.

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below.
  • With a topic — ask about CD-0–CD-4, PB, EVMS, IPT, PARS, risk, exemptions, or CRD.
  • With a chapter — ask for ch01 through ch06.

Supporting files: glossary.md, patterns.md, cheatsheet.md.

Core Frameworks & Mental Models

What the Order is

Risk-informed direction for acquiring capital assets so projects meet the original performance baseline and mission/ES&H/security performance unless a directed change intervenes — aligned with OMB capital-programming expectations.

Critical Decision spine

CD-0 mission need → CD-1 alternative and cost range → CD-2 performance baseline → CD-3 execution/construction start → CD-4 operations/completion.

Control triad after CD-2

Control Role
Performance baseline Commitment snapshot (scope/cost/schedule)
Change control Authorized evolution of the baseline
EVMS + PARS Performance measurement and Department visibility

Governance web

Line management owns outcomes; PSO/PMSO/PM/FPD/IPT and approval authorities form the decision system; CRD carries requirements to contractors; reviews provide independent signal.

Chapter Index

# Section Key content
ch01 Purpose, Applicability, Governance Scope, thresholds, OMB links, exemptions, cancellation
ch02 Critical Decisions CD-0–CD-4 Gate intents, products, authorities
ch03 Acquisition Planning and IPT Strategy, PEP, IPT, front-end planning
ch04 Baseline, Cost, Schedule, EV PB, estimates, EVMS, PARS
ch05 Risk, Safety, Exceptions Risk-informed decisions, S&S/nuclear interfaces, exemptions
ch06 Reviews, Responsibilities, CRD Oversight, roles, contractor flow-down, closeout

Topic Index

  • Acquisition strategy → ch03
  • AoA / alternatives → ch02, ch03
  • CD-0 mission need → ch02
  • CD-1 cost range → ch02
  • CD-2 performance baseline → ch02, ch04
  • CD-3 construction/execution → ch02
  • CD-4 completion/operations → ch02, ch06
  • Change control → ch04
  • Contingency / management reserve → ch04, ch05
  • CRD / contractors → ch01, ch06
  • EVMS → ch04
  • Exemptions / equivalencies → ch01, ch05
  • FPD / IPT → ch03, ch06
  • PARS → ch01, ch04
  • Project reviews → ch06
  • Risk management → ch05
  • TPC thresholds → ch01, ch02

Supporting Files

  • glossary.md — capital-asset PM terms with chapter references
  • patterns.md — implementation patterns (When/How/Trade-offs)
  • cheatsheet.md — CD table, control stack, tells and smells

Scope & Limits

This pack covers the DOE Order on Program and Project Management for the Acquisition of Capital Assets using the consolidated current Order PDF at build time: DOE O 413.3C (approved 2026-08-05), which cancels DOE O 413.3B Chg 7 (2023-06-21). Extract metadata source_pages=132. Pack slug doe-o-413-3 (renamed from doe-413-3b at v1.17.x; catalog carries the old slug as an alias) tracks the current Order series. It does not replace site implementing procedures, full text of companion G 413.3 guides, nuclear safety rule detail (e.g., 10 CFR 830), or GAO-grade estimating standards. In-PDF third-party copyright check at build found no copyright notices. US Government public domain work. No source-material download link is published.

Files (jgs-se-knowledge-packs)
  • chapters
    • ch01-purpose-applicability-governance.md 3.6 KB
      Loading…
    • ch02-critical-decisions-cd0-cd4.md 3.1 KB
      Loading…
    • ch03-acquisition-planning-and-ipt.md 2.9 KB
      Loading…
    • ch04-performance-baseline-cost-schedule.md 2.8 KB
      Loading…
    • ch05-risk-safety-and-exceptions.md 3.2 KB
      Loading…
    • ch06-reviews-responsibilities-crd.md 3.1 KB
      Loading…
  • cheatsheet.md 1.2 KB
    Loading…
  • glossary.md 1.7 KB
    Loading…
  • LICENSE 1.1 KB · in bundle
  • PACK.yaml 1.6 KB
    Loading…
  • patterns.md 1.5 KB
    Loading…
  • SKILL.md 4.9 KB
    ---
    name: doe-o-413-3
    description: "Knowledge base from the DOE Order on Program and Project Management for the Acquisition of Capital Assets (DOE O 413.3 series). Use for Critical Decisions CD-0–CD-4, performance baselines, acquisition strategy and IPTs, cost/schedule/EVMS/PARS controls, risk-informed governance, reviews, and contractor requirements. Built from O 413.3C (2026-08-05), which cancels O 413.3B Chg 7 (2023-06-21); does not replace site-specific procedures, nuclear safety rules detail, or full estimating standards."
    ---
    
    <!-- argument-hint: [topic, CD, or chapter number] -->
    
    # DOE Capital Asset Project Management (O 413.3 series)
    **Source**: DOE O 413.3C (2026-08-05; cancels O 413.3B Chg 7) (US Government work, public domain) | **Chapters**: 6
    
    ## When to use
    Reach for this pack when planning, governing, or reviewing DOE/NNSA capital asset projects under the 413.3 Order family — mission need through completion, Critical Decision gates, performance baselines, acquisition strategy and IPTs, EVMS/PARS reporting, risk-informed approvals, exemptions, and contractor requirements flow-down.
    
    **Prerequisites:** none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.
    
    ## How to Use This Skill
    - **Without arguments** — load the core frameworks below.
    - **With a topic** — ask about CD-0–CD-4, PB, EVMS, IPT, PARS, risk, exemptions, or CRD.
    - **With a chapter** — ask for `ch01` through `ch06`.
    
    Supporting files: `glossary.md`, `patterns.md`, `cheatsheet.md`.
    
    ## Core Frameworks & Mental Models
    
    ### What the Order is
    Risk-informed direction for acquiring capital assets so projects meet the original performance baseline and mission/ES&H/security performance unless a directed change intervenes — aligned with OMB capital-programming expectations.
    
    ### Critical Decision spine
    CD-0 mission need → CD-1 alternative and cost range → CD-2 performance baseline → CD-3 execution/construction start → CD-4 operations/completion.
    
    ### Control triad after CD-2
    | Control | Role |
    |---------|------|
    | Performance baseline | Commitment snapshot (scope/cost/schedule) |
    | Change control | Authorized evolution of the baseline |
    | EVMS + PARS | Performance measurement and Department visibility |
    
    ### Governance web
    Line management owns outcomes; PSO/PMSO/PM/FPD/IPT and approval authorities form the decision system; CRD carries requirements to contractors; reviews provide independent signal.
    
    ## Chapter Index
    | # | Section | Key content |
    |---|---------|-------------|
    | [ch01](chapters/ch01-purpose-applicability-governance.md) | Purpose, Applicability, Governance | Scope, thresholds, OMB links, exemptions, cancellation |
    | [ch02](chapters/ch02-critical-decisions-cd0-cd4.md) | Critical Decisions CD-0–CD-4 | Gate intents, products, authorities |
    | [ch03](chapters/ch03-acquisition-planning-and-ipt.md) | Acquisition Planning and IPT | Strategy, PEP, IPT, front-end planning |
    | [ch04](chapters/ch04-performance-baseline-cost-schedule.md) | Baseline, Cost, Schedule, EV | PB, estimates, EVMS, PARS |
    | [ch05](chapters/ch05-risk-safety-and-exceptions.md) | Risk, Safety, Exceptions | Risk-informed decisions, S&S/nuclear interfaces, exemptions |
    | [ch06](chapters/ch06-reviews-responsibilities-crd.md) | Reviews, Responsibilities, CRD | Oversight, roles, contractor flow-down, closeout |
    
    ## Topic Index
    - **Acquisition strategy** → ch03
    - **AoA / alternatives** → ch02, ch03
    - **CD-0 mission need** → ch02
    - **CD-1 cost range** → ch02
    - **CD-2 performance baseline** → ch02, ch04
    - **CD-3 construction/execution** → ch02
    - **CD-4 completion/operations** → ch02, ch06
    - **Change control** → ch04
    - **Contingency / management reserve** → ch04, ch05
    - **CRD / contractors** → ch01, ch06
    - **EVMS** → ch04
    - **Exemptions / equivalencies** → ch01, ch05
    - **FPD / IPT** → ch03, ch06
    - **PARS** → ch01, ch04
    - **Project reviews** → ch06
    - **Risk management** → ch05
    - **TPC thresholds** → ch01, ch02
    
    ## Supporting Files
    - [glossary.md](glossary.md) — capital-asset PM terms with chapter references
    - [patterns.md](patterns.md) — implementation patterns (When/How/Trade-offs)
    - [cheatsheet.md](cheatsheet.md) — CD table, control stack, tells and smells
    
    ---
    
    ## Scope & Limits
    This pack covers the DOE Order on Program and Project Management for the Acquisition of Capital Assets using the **consolidated current Order PDF at build time: DOE O 413.3C (approved 2026-08-05)**, which cancels **DOE O 413.3B Chg 7 (2023-06-21)**. Extract metadata **source_pages=132**. Pack slug `doe-o-413-3` (renamed from `doe-413-3b` at v1.17.x; catalog carries the old slug as an alias) tracks the current Order series. It does **not** replace site implementing procedures, full text of companion G 413.3 guides, nuclear safety rule detail (e.g., 10 CFR 830), or GAO-grade estimating standards. In-PDF third-party copyright check at build found no copyright notices. US Government public domain work. No source-material download link is published.
    