chained-pr
Trigger: PRs over 400 lines, stacked PRs, review slices. Split oversized changes into chained PRs that protect review focus.
Install
npx skills add https://github.com/Gentleman-Programming/gentle-ai/tree/main/internal/assets/skills/chained-pr
claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install gentleman-programming-gentle-ai@llmmart
git clone https://github.com/Gentleman-Programming/gentle-ai.git
The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole gentleman-programming/gentle-ai collection as a plugin from our marketplace. Git is the plain clone.
Skill manifest
Activation Contract
Load this skill when a planned PR may exceed 400 changed lines, an ODD feature's forecast or running authored changed-line count from work-unit commits exceeds about 400, or the user asks for chained/stacked PRs, review slices, or reviewer-load control.
Hard Rules
- Split PRs over 400 changed lines unless a maintainer explicitly accepts
size:exception. - The budget constrains how work is sliced, never the code itself. Never delete comments, blank lines, docs, or tests, and never compress or restyle code, to fit under the budget.
- Slicing is bounded: make one honest slicing pass. If no cohesive split brings every slice within budget, stop iterating, keep the best cohesive split, and report the final line count with a
size:exceptionrecommendation. - Keep each PR reviewable in about ≤60 minutes.
- Use one deliverable work unit per PR; keep tests/docs with the unit they verify.
- State start, end, prior dependencies, follow-up work, and out-of-scope items in every chained PR.
- Every child PR must include a dependency diagram marking the current PR with
📍. - In Feature Branch Chain, create a draft/no-merge tracker PR; child PR #1 targets the tracker branch, later children target the immediate parent branch.
- Treat polluted diffs as base bugs: retarget or rebase until only the current work unit appears.
- Do not mix chain strategies after the user chooses one.
Decision Gates
| Condition | Action |
|---|---|
| PR ≤400 changed lines and focused | Keep single PR. |
| PR >400, each slice can land independently | Use Stacked PRs to main. |
| PR >400, feature must integrate before main | Use Feature Branch Chain with tracker. |
| Generated/vendor/migration diff cannot split cleanly | Ask maintainer for size:exception. |
| No cohesive split fits the budget after one slicing pass | Stop; deliver the best split, report the overage and why it cannot shrink further, and recommend size:exception. |
ODD provides delivery_strategy and chain_strategy |
Follow them before the next work-unit commit or PR creation. |
Execution Steps
- Estimate changed lines and identify independent work units.
- Ask for a chain strategy when none is cached and the budget is exceeded.
- Create branches/PRs using the chosen strategy only.
- Add Chain Context to each PR without replacing the repo PR template.
- Verify each PR independently: CI/tests/docs/manual checks, rollback scope, and clean diff.
- Keep tracker PR draft/no-merge until all child PRs are reviewed and integrated.
Output Contract
Return the chosen strategy, PR order, current PR boundary, dependency diagram, review budget (additions + deletions), verification plan, and any size:exception rationale.
References
- references/chaining-details.md — strategy diagrams, PR body section, branch commands, and reviewer guidance.
Files (gentle-ai)
-
references
-
chaining-details.md 3.2 KB
Loading…
-
-
SKILL.md 3.1 KB
--- name: chained-pr description: "Trigger: PRs over 400 lines, stacked PRs, review slices. Split oversized changes into chained PRs that protect review focus." license: Apache-2.0 metadata: author: gentleman-programming version: "1.0" --- ## Activation Contract Load this skill when a planned PR may exceed **400 changed lines**, an ODD feature's forecast or running authored changed-line count from work-unit commits exceeds about 400, or the user asks for chained/stacked PRs, review slices, or reviewer-load control. ## Hard Rules - Split PRs over **400 changed lines** unless a maintainer explicitly accepts `size:exception`. - The budget constrains how work is **sliced**, never the code itself. Never delete comments, blank lines, docs, or tests, and never compress or restyle code, to fit under the budget. - Slicing is bounded: make **one** honest slicing pass. If no cohesive split brings every slice within budget, stop iterating, keep the best cohesive split, and report the final line count with a `size:exception` recommendation. - Keep each PR reviewable in about **≤60 minutes**. - Use one deliverable work unit per PR; keep tests/docs with the unit they verify. - State start, end, prior dependencies, follow-up work, and out-of-scope items in every chained PR. - Every child PR must include a dependency diagram marking the current PR with `📍`. - In Feature Branch Chain, create a draft/no-merge tracker PR; child PR #1 targets the tracker branch, later children target the immediate parent branch. - Treat polluted diffs as base bugs: retarget or rebase until only the current work unit appears. - Do not mix chain strategies after the user chooses one. ## Decision Gates | Condition | Action | |---|---| | PR ≤400 changed lines and focused | Keep single PR. | | PR >400, each slice can land independently | Use Stacked PRs to main. | | PR >400, feature must integrate before main | Use Feature Branch Chain with tracker. | | Generated/vendor/migration diff cannot split cleanly | Ask maintainer for `size:exception`. | | No cohesive split fits the budget after one slicing pass | Stop; deliver the best split, report the overage and why it cannot shrink further, and recommend `size:exception`. | | ODD provides `delivery_strategy` and `chain_strategy` | Follow them before the next work-unit commit or PR creation. | ## Execution Steps 1. Estimate changed lines and identify independent work units. 2. Ask for a chain strategy when none is cached and the budget is exceeded. 3. Create branches/PRs using the chosen strategy only. 4. Add Chain Context to each PR without replacing the repo PR template. 5. Verify each PR independently: CI/tests/docs/manual checks, rollback scope, and clean diff. 6. Keep tracker PR draft/no-merge until all child PRs are reviewed and integrated. ## Output Contract Return the chosen strategy, PR order, current PR boundary, dependency diagram, review budget (`additions + deletions`), verification plan, and any `size:exception` rationale. ## References - [references/chaining-details.md](references/chaining-details.md) — strategy diagrams, PR body section, branch commands, and reviewer guidance.
Comments (0)
Sign in to join the conversation.
Reviews (0)
No reviews yet.
No comments yet.