Claude Skill

chained-pr

Trigger: PRs over 400 lines, stacked PRs, review slices. Split oversized changes into chained PRs that protect review focus.

LLM Mart · 0 points · 11 views 0 listing impressions 0 install-command copies
Download Gentleman-Programming-gentle-ai-internal_assets_skills_chained-pr-4c69c0e.zip · 3 KB

Install

skills CLI npx skills add https://github.com/Gentleman-Programming/gentle-ai/tree/main/internal/assets/skills/chained-pr
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install gentleman-programming-gentle-ai@llmmart
Git git clone https://github.com/Gentleman-Programming/gentle-ai.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole gentleman-programming/gentle-ai collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

Activation Contract

Load this skill when a planned PR may exceed 400 changed lines, an ODD feature's forecast or running authored changed-line count from work-unit commits exceeds about 400, or the user asks for chained/stacked PRs, review slices, or reviewer-load control.

Hard Rules

  • Split PRs over 400 changed lines unless a maintainer explicitly accepts size:exception.
  • The budget constrains how work is sliced, never the code itself. Never delete comments, blank lines, docs, or tests, and never compress or restyle code, to fit under the budget.
  • Slicing is bounded: make one honest slicing pass. If no cohesive split brings every slice within budget, stop iterating, keep the best cohesive split, and report the final line count with a size:exception recommendation.
  • Keep each PR reviewable in about ≤60 minutes.
  • Use one deliverable work unit per PR; keep tests/docs with the unit they verify.
  • State start, end, prior dependencies, follow-up work, and out-of-scope items in every chained PR.
  • Every child PR must include a dependency diagram marking the current PR with 📍.
  • In Feature Branch Chain, create a draft/no-merge tracker PR; child PR #1 targets the tracker branch, later children target the immediate parent branch.
  • Treat polluted diffs as base bugs: retarget or rebase until only the current work unit appears.
  • Do not mix chain strategies after the user chooses one.

Decision Gates

Condition Action
PR ≤400 changed lines and focused Keep single PR.
PR >400, each slice can land independently Use Stacked PRs to main.
PR >400, feature must integrate before main Use Feature Branch Chain with tracker.
Generated/vendor/migration diff cannot split cleanly Ask maintainer for size:exception.
No cohesive split fits the budget after one slicing pass Stop; deliver the best split, report the overage and why it cannot shrink further, and recommend size:exception.
ODD provides delivery_strategy and chain_strategy Follow them before the next work-unit commit or PR creation.

Execution Steps

  1. Estimate changed lines and identify independent work units.
  2. Ask for a chain strategy when none is cached and the budget is exceeded.
  3. Create branches/PRs using the chosen strategy only.
  4. Add Chain Context to each PR without replacing the repo PR template.
  5. Verify each PR independently: CI/tests/docs/manual checks, rollback scope, and clean diff.
  6. Keep tracker PR draft/no-merge until all child PRs are reviewed and integrated.

Output Contract

Return the chosen strategy, PR order, current PR boundary, dependency diagram, review budget (additions + deletions), verification plan, and any size:exception rationale.

References

Files (gentle-ai)
  • references
    • chaining-details.md 3.2 KB
      Loading…
  • SKILL.md 3.1 KB
    ---
    name: chained-pr
    description: "Trigger: PRs over 400 lines, stacked PRs, review slices. Split oversized changes into chained PRs that protect review focus."
    license: Apache-2.0
    metadata:
      author: gentleman-programming
      version: "1.0"
    ---
    
    ## Activation Contract
    
    Load this skill when a planned PR may exceed **400 changed lines**, an ODD feature's forecast or running authored changed-line count from work-unit commits exceeds about 400, or the user asks for chained/stacked PRs, review slices, or reviewer-load control.
    
    ## Hard Rules
    
    - Split PRs over **400 changed lines** unless a maintainer explicitly accepts `size:exception`.
    - The budget constrains how work is **sliced**, never the code itself. Never delete comments, blank lines, docs, or tests, and never compress or restyle code, to fit under the budget.
    - Slicing is bounded: make **one** honest slicing pass. If no cohesive split brings every slice within budget, stop iterating, keep the best cohesive split, and report the final line count with a `size:exception` recommendation.
    - Keep each PR reviewable in about **≤60 minutes**.
    - Use one deliverable work unit per PR; keep tests/docs with the unit they verify.
    - State start, end, prior dependencies, follow-up work, and out-of-scope items in every chained PR.
    - Every child PR must include a dependency diagram marking the current PR with `📍`.
    - In Feature Branch Chain, create a draft/no-merge tracker PR; child PR #1 targets the tracker branch, later children target the immediate parent branch.
    - Treat polluted diffs as base bugs: retarget or rebase until only the current work unit appears.
    - Do not mix chain strategies after the user chooses one.
    
    ## Decision Gates
    
    | Condition | Action |
    |---|---|
    | PR ≤400 changed lines and focused | Keep single PR. |
    | PR >400, each slice can land independently | Use Stacked PRs to main. |
    | PR >400, feature must integrate before main | Use Feature Branch Chain with tracker. |
    | Generated/vendor/migration diff cannot split cleanly | Ask maintainer for `size:exception`. |
    | No cohesive split fits the budget after one slicing pass | Stop; deliver the best split, report the overage and why it cannot shrink further, and recommend `size:exception`. |
    | ODD provides `delivery_strategy` and `chain_strategy` | Follow them before the next work-unit commit or PR creation. |
    
    ## Execution Steps
    
    1. Estimate changed lines and identify independent work units.
    2. Ask for a chain strategy when none is cached and the budget is exceeded.
    3. Create branches/PRs using the chosen strategy only.
    4. Add Chain Context to each PR without replacing the repo PR template.
    5. Verify each PR independently: CI/tests/docs/manual checks, rollback scope, and clean diff.
    6. Keep tracker PR draft/no-merge until all child PRs are reviewed and integrated.
    
    ## Output Contract
    
    Return the chosen strategy, PR order, current PR boundary, dependency diagram, review budget (`additions + deletions`), verification plan, and any `size:exception` rationale.
    
    ## References
    
    - [references/chaining-details.md](references/chaining-details.md) — strategy diagrams, PR body section, branch commands, and reviewer guidance.
    

Comments (0)

Sign in to join the conversation.

No comments yet.

Reviews (0)

No reviews yet.