Claude Skill

brief-to-tasks

Break a design brief into executable time-boxed tasks, each with a done-when line. Use immediately before a build session.

LLM Mart · 0 points · 0 views 0 listing impressions 0 install-command copies
Virus-scanned Reviewed automatically before listing.

Full trust report

Download mshadmanrahman-claude-for-designers-.claude_skills_brief-to-tasks-9e9874c.zip · 1 KB
Part of mshadmanrahman/claude-for-designers — 12 skills

Install

skills CLI npx skills add https://github.com/mshadmanrahman/claude-for-designers/tree/main/.claude/skills/brief-to-tasks
Claude Code claude plugin marketplace add https://llmmart.ai/marketplace.json && claude plugin install mshadmanrahman-claude-for-designers@llmmart
Git git clone https://github.com/mshadmanrahman/claude-for-designers.git

The skills CLI installs just this skill, for any of its supported agents. Claude Code installs the whole mshadmanrahman/claude-for-designers collection as a plugin from our marketplace. Git is the plain clone.

Skill manifest

You are breaking a design brief into executable work. Vague tasks produce vague output. Every task here must be completable by one person in one focused session.

Start by reading the design brief and the information architecture document if they exist. If neither exists, ask the user to complete /design-brief and /information-architecture first. Tasks cannot be accurate without this foundation.

Produce a task list with these four phases:

Phase 1: Foundation Tasks that must happen before screens can be built. Includes: design tokens (if not done), setting up the file structure, confirming the component library, documenting any existing patterns being reused.

Phase 2: Structure IA and wireframe tasks. Each screen in the inventory gets a wireframe task. Navigation flows get their own task. These are low-fidelity; the goal is structure, not polish.

Phase 3: Build High-fidelity screen and component tasks. One task per major screen or component. Include variant tasks separately (error state, empty state, responsive layout).

Phase 4: Review Critique, accessibility check, edge case review. These are not optional phases; list them as real tasks with time estimates.

For each task, include:

  • A clear title starting with a verb (Design, Write, Build, Review, Define)
  • A "done when" definition: the specific condition that marks this task complete
  • Dependencies: which prior tasks must be complete before this one starts

Format as a markdown checklist. Show dependencies inline as "(requires: Task X)". Order tasks within each phase by dependency, not by importance. A task with no dependencies can run in parallel with others; call that out explicitly.

Files (claude-for-designers)
  • SKILL.md 1.8 KB
    ---
    name: brief-to-tasks
    description: "Break a design brief into executable time-boxed tasks, each with a done-when line. Use immediately before a build session."
    ---
    
    You are breaking a design brief into executable work. Vague tasks produce vague output. Every task here must be completable by one person in one focused session.
    
    Start by reading the design brief and the information architecture document if they exist. If neither exists, ask the user to complete `/design-brief` and `/information-architecture` first. Tasks cannot be accurate without this foundation.
    
    Produce a task list with these four phases:
    
    **Phase 1: Foundation**
    Tasks that must happen before screens can be built. Includes: design tokens (if not done), setting up the file structure, confirming the component library, documenting any existing patterns being reused.
    
    **Phase 2: Structure**
    IA and wireframe tasks. Each screen in the inventory gets a wireframe task. Navigation flows get their own task. These are low-fidelity; the goal is structure, not polish.
    
    **Phase 3: Build**
    High-fidelity screen and component tasks. One task per major screen or component. Include variant tasks separately (error state, empty state, responsive layout).
    
    **Phase 4: Review**
    Critique, accessibility check, edge case review. These are not optional phases; list them as real tasks with time estimates.
    
    For each task, include:
    - A clear title starting with a verb (Design, Write, Build, Review, Define)
    - A "done when" definition: the specific condition that marks this task complete
    - Dependencies: which prior tasks must be complete before this one starts
    
    Format as a markdown checklist. Show dependencies inline as "(requires: Task X)". Order tasks within each phase by dependency, not by importance. A task with no dependencies can run in parallel with others; call that out explicitly.
    

Comments (0)

Sign in to join the conversation.

No comments yet.

Reviews (0)

No reviews yet.

Related